Functional description
5
gas-lab
Q1
Page 43
After confirming the calibration with methane (1. calibration gas) runs
automatically. The adjustment starts after approx. 2 minutes for purging and
lasts for 15 minutes, whereas the remaining time is displayed.
Meanwhile turn off the nitrogen cylinder and remove the tube on both sides.
(Caution: Unpressurise the line first!).
Furthermore you can prepare the second calibration gas (H2-11K) on the third
gas path (see step 1. Preparation) When the calibration process with methane
(1. calibration gas) is finished, the following display appears:
4. Calibration with H2-11K (2. calibration gas)
Now the prepared H2-11K has to be switched on. Please invoke the menu and
select the menu item
gas switched on
.