A533-23-880 Issue C
Page 42
© Edwards Limited 2009. All rights reserved.
Edwards and the Edwards logo are trademarks of Edwards Limited.
INSTALLATION
Figure 18 - Leak test port positions
1. HMB pump
2. FDP pump
3. Leak-test port (blanked)
4. Support manifold