10.5
Pump head size 5 l/h and 11 l/h
Fig. 113: Replacing the pump head and diaphragm
1
Cover plate
2
Metering head screws (4 off)
3
Pump head
4
Diaphragm
5
Intermediate plate
6
Protective diaphragms
7
Vent screw
Note the following points during assembly:
–
Fit new protective diaphragm in the correct positions.
–
Place in the intermediate plate in the correct position.
–
Turn the adapter plate clockwise until the diaphragm rupture drain faces
down.
–
Mount the pump head and pay attention to the direction of flow
–
Hand-tighten the pump head screws and then tighten them crosswise.
1.
Remove the cover plate (pos. 1) on the metering head
2.
Loosen the metering head screws (pos. 2).
3.
Remove the pump head (pos. 3).
4.
Take out diaphragm (4) and intermediate plate (5).
5.
Remove the protective diaphragm (6) from the plunger.
6.
Fit new protective diaphragm in the correct positions.
7.
Reverse this procedure for re-installation.
Service
168
Rev. 2-05.2018
Содержание EcoAdd
Страница 1: ...Ecolab Dynamic Pump EcoAdd Operating instructions 417102276 EcoAdd Rev 2 05 2018 08 05 2018 ENGLISH...
Страница 201: ...201 Rev 2 05 2018...
Страница 202: ...202 Rev 2 05 2018...
Страница 203: ......