Startup of VS 300
68
Doku-Version 2.05 - Firmware 2.10 - 15. September 2017
5.3.2.6 Other parameters to be set
There are a number of other parameters that need to be set for startup:
S
System configuration: Allocation of relay/control stages, refrigarant
Menu 3-1 respectively parameter list S3 – Setpoints - System Configuration - Control Loop 1 and 2
S
LP/HP sensor characteristic setting / pressure transducer configuration
Menu 3-1 respectively parameter list S3 - Setpoints - System Configuration - Control Loop 1 and 2
S
Dispatching of the internal alarm outputs
Menu 3-1 respectively parameter list S3 - Common setpoints system configuration - Control loop 1 and 2
S
Operating mode selection/Refrigeration point control
Parameter List S3 - Common Setpoints - System Configuration - Control Loop 1 and 2
S
Control mode setting (step, speed or combined controller)
Menu 3-2-1 (CL1) and 3-2-2 (CL2) respectively parameter list S3 – Common Setpoints - System Configuration
- Control Loop 1 and 2. For details see section 3
Control Algorithm with Speed Controller
for high-pressure
control
S
Configuration of the four digital inputs
Menu 3-5 respectively parameter List S3 - Common Setpoints - System Configuration - Control Loop 1 and 2
S
Setpoint configuration
Menu 3-2-4 (CL1) and 3-2-5 (CL2) respectively parameter list S3 - Common Setpoints - System Configuration
- Control Loop 1 and 2
For details and further information see section 3 Function of VS 300.
Faulty parameter setting can result in severe impairment of system function.
5.3.2.7 Parameter backup
The VS 300 Pack Controller allows of backing up parameters as set. After making individual parameter setting on the
controller, these parameters can be backed up by choosing Parameter
Parameter Backup
(menu 3-7) respectively
S392
in Parameter List S3 or with an external terminal (AL 300 or CI 3000). Should the controller parameters become
inconsistent for any reason during operation, the controller will load the parameters from backup memory instead of
the defaults.
Parameter backup should be made
following
successful individual parameter setting and startup of
the system.
Содержание VS 300
Страница 8: ...vi Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Страница 18: ...System Design of VS 300 10 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Страница 22: ...Application of VS 300 14 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Страница 158: ...Parameter List and Menu Structure of VS 300 150 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Страница 160: ...Decommissioning and disposal 152 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Страница 166: ...Alarms and Messages of VS 300 158 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Страница 170: ...162 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Страница 172: ...Order No s and accessories of VS 300 164 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...