Function of VS 300
31
Doku-Version 2.05 - Firmware 2.10 - 15. September 2017
Basic time and maximum variable time for loading and unloading are programmable parameters. The following
relationships apply to determining actuating times:
t = t
b
+ t
v
= Actuating time
t
b
= Basic time: Can be programmed for every loading of a compressor capacity stage.
t
v
= Variable actuating time
The following applies for t
v
:
t
v
t
v_max
(
t
v_max
d
t
)
d
t_max
d
t
> d
t_ma
x
is equivalent to
d
t
= d
t_max
t
v
= Variable actuating time
t
v_max
= Maximum variable actuating time (definable)
d
t
= Control error
d
t_max
= Maximum control error/constant (definable)
Load delay is actuated on loading a compressor capacity stage or when rising suction pressure reaches a value
greater than the lower limit of the neutral zone.
Unload delay is actuated on unloading a compressor capacity stage or when falling suction pressure reaches a
value less than the upper limit of the neutral zone.
Actuating time is calculated at every controller cycle. The variable time is recalculated and the time elapsed
since the last actuation is compared with the calculated time. If the calculated actuating time is less than or
equal to the elapsed time, compressor actuation takes place provided the controlled variable p
0
is outside the
neutral zone. The following diagram illustrates calculation of actuating time:
ZNR
.
51203
64
230
E
1
Contro
l
error
dt
[°
C
]
Run time
[
s
]
Compressor run times
0
2
4
6
dt
8
10
dt max
12
0
20
4
0
6
0
8
0
100
120
1
4
0
120
1
6
0
1
8
0
200
220
2
4
0
t
v max
Basic time t
b
Run time t
=
t + t
v
b
t + t
v max
b
t
b
t
v
Содержание VS 300
Страница 8: ...vi Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Страница 18: ...System Design of VS 300 10 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Страница 22: ...Application of VS 300 14 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Страница 158: ...Parameter List and Menu Structure of VS 300 150 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Страница 160: ...Decommissioning and disposal 152 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Страница 166: ...Alarms and Messages of VS 300 158 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Страница 170: ...162 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Страница 172: ...Order No s and accessories of VS 300 164 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...