Operation
Copyright © 2004-2009 Eaton Corporation. All Rights Reserved.
IPN 997-00012-35E December 2009
15
LVD Test
The LVD Test function allows the LVD contactors to be manually connected or disconnected
from
DCTools
or the keypad.
►
To activate the LVD Test function using
DCTools
1
Start
DCTools
(refer to the Communications Options on page
2
From the
DCTools
System Summary (Home) screen, go to
LVD.
3
Click on
LVD1
or
LVD2
as required.
4
Click on the
Front Panel LVD Test
button.
5
Click the
Apply Changes
button.
►
To activate the LVD Test function using the keypad
1
Press
:
to go to Status View Mode.
2
Press
6
until the display shows LVD1 Test. If required, press
6
again to access LVD2
Test.
3
Press
8
to edit the LVD state.
4
Press
8
to confirm the change.
5
Press
6
7
to connect/disconnect the LVD as required.
6
Press
9
to go to Status View Mode.
7
Press
9
to go to Main Display Mode.
Rectifier Restart
This function temporarily restarts rectifiers that have either been shutdown automatically by
Load-based Rectifier Shutdown (LBRS) (see details on page
), or manually shutdown from
DCTools
or
PowerManagerII
.
Rectifiers shutdown will have the
<
(red) alarm LED on. Therefore, use this function to
restart all rectifiers to identify a faulty rectifier.
Load-based Rectifier Shutdown will continue to operate and some rectifiers will shut down
again after a period, depending on the LBRS configuration parameters. Rectifiers that were
previously shutdown manually will remain operating.
►
To restart shutdown rectifiers using the SM65 keypad
1
Press
:
to go to Status View Mode.
2
Press
6
until the display shows
Auto Rect Shutdown
3
Press
8
to restart all shutdown rectifiers.
4
Press
9
to go to Main Display Mode.