2 Engineering
2.4 Electrical power network
Rapid Link 5 · RAMO5 · RASP5
10/19 MN034004EN
www.eaton.com
41
2.4.3 Voltage balance
Because of the uneven loading on the conductor and with the direct connec-
tion of greater power ratings, deviations from the ideal voltage form and
asymmetrical voltages can be caused in three-phase AC supply system.
If this condition is not fulfilled, or symmetry at the connection location is not
known, the use of a main choke in the mains-side feeder unit of the power
bus is recommended.
→
In the project planning consider only AC power networks that
handle permitted asymmetric divergences in the mains voltage
≦
+3 %.
Содержание Rapid Link RAMO5
Страница 1: ...Manual Rapid Link 5 RAMO5 RASP5 10 19 MN034004EN ...
Страница 4: ...II ...
Страница 10: ...6 Rapid Link 5 RAMO5 RASP5 10 19 MN034004EN www eaton com ...
Страница 122: ...4 Operation 4 3 Manual control 118 Rapid Link 5 RAMO5 RASP5 10 19 MN034004EN www eaton com ...
Страница 136: ...5 RAMO5 Motor starter 5 7 Configure special settings 132 Rapid Link 5 RAMO5 RASP5 10 19 MN034004EN www eaton com ...
Страница 158: ...8 PC tool 8 2 Parameter Editor 154 Rapid Link 5 RAMO5 RASP5 10 19 MN034004EN www eaton com ...
Страница 164: ...9 Control Unit 9 2 Extended parameter set 160 Rapid Link 5 RAMO5 RASP5 10 19 MN034004EN www eaton com ...
Страница 194: ...10 Parameter list 10 4 Parameter groups for RASP 190 Rapid Link 5 RAMO5 RASP5 10 19 MN034004EN www eaton com ...
Страница 208: ...11 Communications 11 5 OP Bus 204 Rapid Link 5 RAMO5 RASP5 10 19 MN034004EN www eaton com ...
Страница 216: ...12 Error messages 12 3 RASP Error list 212 Rapid Link 5 RAMO5 RASP5 10 19 MN034004EN www eaton com ...