8-18
IB02601006E
www.eaton.com
Chapter 8:
Programming the IQ 250/260 IQ 250/260 Meter
2. Double-click an
Assigned Channel
field to
add
or
edit
an Output ID.
You will see the window shown on the right.
3. Select the Counter Type. The available selections are:
• Energy, All Phases
• End of Interval Event
– this counter is triggered by a
Demand Averaging Interval
• Energy, Phase A
• Energy, Phase B
• Energy, Phase C
• None.
NOTE
: If you select one of the
Energy Counter Types
, you will see the
Energy
Counter
field, shown on the right. The available selections are:
Total Watt Hour;
Positive Watt Hour; Negative Watt Hour; Total VAR Hour; Positive VAR Hour;
Negative VAR Hour; VA Hour; Received Watt Hour; Delivered Watt Hour;
Inductive VAR Hour; Capacitive VAR Hour.
4. Click
OK
. The
Counter Type
you selected displays in the
Assigned Channel
field
of the
Pulse Output Settings
screen.
5. When you select the
Assigned Channel
, a value is entered for it in the
Units/Count
field. You can edit this field by double-clicking in it. The Units/Count is determined by the
Secondary
(the
readings in the meter).
6. The
current Output Labels
are displayed on the screen. To
change
the Output labels, click in the Labels field
you want to change, and enter a new label.
7. Click
Digital Input Settings
.
•
You can set up to
four Input IDs
for your Card, and
assign a Label, Open Label, and Closed Label for
each.
•
You can assign labels and other information for
Accumulators for the Inputs.
a. Make a selection in the
Assigned to
field. The
available selections are:
• Status Only
• EOI Pulse, Trigger on Contact Closing
• EOI Pulse, Trigger on Contact Opening
• EOI Pulse, Trigger on Contact Change
• Accumulator, Increment on Contact Closing
• Accumulator, Increment on Contact Opening
• Accumulator, Increment on Contact Change
NOTES on End of Interval (EOI):
• EOI is triggered when the selected condition is met.
• EOI is used as a
trigger
for
demand averaging
: when the selected condition is met, the EOI delineates
an interval that results in demand averaging being performed.
• The minimum interval between EOI Pulses used to trigger demand averaging should be 5 minutes.
•
Only one Option Card input or output can be set to trigger an EOI pulse
.
Содержание IQ 250
Страница 2: ......
Страница 22: ...3 6 IB02601006E www eaton com Chapter 3 Mechanical Installation IQ 250 260 Meter...
Страница 38: ...4 16 IB2601006E www eaton com Chapter 4 Electrical Installation IQ 250 260 Meter...
Страница 100: ...A 2 IB02601006E www eaton com Appendix A IQ 250 260 Navigation Maps IQ 250 260 Meter Main Menu Screens Sheet 1...
Страница 101: ...Appendix A IQ 250 260 Meter IQ 250 260 Navigation Maps www eaton com IB02601006E A 3 Operating Mode Screens Sheet 2...
Страница 102: ...A 4 IB02601006E www eaton com Appendix A IQ 250 260 Navigation Maps IQ 250 260 Meter Reset Mode Screens Sheet 3...
Страница 103: ...Appendix A IQ 250 260 Meter IQ 250 260 Navigation Maps www eaton com IB02601006E A 5 Con guration Mode Screens Sheet 4...
Страница 104: ...A 6 IB02601006E www eaton com Appendix A IQ 250 260 Navigation Maps IQ 250 260 Meter...
Страница 134: ...A IQ 250 260 Meter Appendix B Modbus Mapping www eaton com IB02601006E MM 28...