4-2
IB2601006E
www.eaton.com
Chapter 4:
Electrical Installation IQ 250/260 Meter
CT Leads Terminated to Meter
The IQ 250/260 is designed to have Current Inputs wired in one of three ways. Diagram 4.1 shows the most typical
connection where CT Leads are terminated to the meter at the Current Gills. This connection uses Nickel-Plated
Brass Studs (Current Gills) with screws at each end. This connection allows the CT wires to be terminated using
either an “O” or a “U” lug. Tighten the screws with a #2 Phillips screwdriver.
Other current connections are shown in Figures 4.2 and 4.3. Voltage and RS485/KYZ Connection is shown in
Figure 4.4.
Wiring Diagrams are shown later in this chapter.
Communications Connections are detailed in Chapter 5.
Current Gills
(Nickel-Plated Brass Stud)
Figure 4.1: CT Leads terminated to Meter, #8 Screw for Lug Connection
Содержание IQ 250
Страница 2: ......
Страница 22: ...3 6 IB02601006E www eaton com Chapter 3 Mechanical Installation IQ 250 260 Meter...
Страница 38: ...4 16 IB2601006E www eaton com Chapter 4 Electrical Installation IQ 250 260 Meter...
Страница 100: ...A 2 IB02601006E www eaton com Appendix A IQ 250 260 Navigation Maps IQ 250 260 Meter Main Menu Screens Sheet 1...
Страница 101: ...Appendix A IQ 250 260 Meter IQ 250 260 Navigation Maps www eaton com IB02601006E A 3 Operating Mode Screens Sheet 2...
Страница 102: ...A 4 IB02601006E www eaton com Appendix A IQ 250 260 Navigation Maps IQ 250 260 Meter Reset Mode Screens Sheet 3...
Страница 103: ...Appendix A IQ 250 260 Meter IQ 250 260 Navigation Maps www eaton com IB02601006E A 5 Con guration Mode Screens Sheet 4...
Страница 104: ...A 6 IB02601006E www eaton com Appendix A IQ 250 260 Navigation Maps IQ 250 260 Meter...
Страница 134: ...A IQ 250 260 Meter Appendix B Modbus Mapping www eaton com IB02601006E MM 28...