Installation Leaflet

Page 6         Effective: November 2002

Pow-R-Command

JCI-100 Controller

IL01412006E  

                                                For More Information visit www.cutler-hammer.com

2-3-1 PRIMARY FUSING

Located in the bottom left corner of the 5X
Chassis is a fuse designed to protect the
primary side of the Control Power
Transformer.  For safety reasons the
primary fusing is concealed beneath a
metal plate (See Figure 2-3-1.1).  To check
and or replace the primary fusing this plate
must be removed.  The fuse itself is
secured behind the black fuse cover (See
Figure 2-3-1.2).  In a Pow-R-Command 100
Relay Cabinet & Control Cabinet, the
primary fusing is 

not

 concealed, and is

located in the upper right of the unit.  If
replacing the fuse, the replacement must be

2.5 ampere time delay fuse rated

500V ac with an interrupting rating of
10kA that is UL listed only.

---WARNING---

When preforming any maintenance on
the primary fusing, disconnect all
power to the panelboard.  Failure to
do so may cause property damage,
personnel injury, or even death.

2-3-2 CONTROL POWER TRANSFORMER

To provide control voltage to operate
switching devices, a Control Power
Transformer (CTP) is provided in each 5X
Control Chassis, Pow-R-Command 100
Relay Cabinet, and Pow-R-Command 100
Control Cabinet.  The primary side of the
CPT is a dual tap system meaning that
there is a wire lead for 120V ac operation
or 277V ac operation.  If the application
calls for 120V ac, a 

red

 wire lead will be

extending out of the structure.  Conversely,
if the application calls for 277V ac, a

yellow

 wire lead will be extending form

the control chassis.   The unneeded wire
lead will be terminated and capped before
shipment.

When the using the 5X Control Chassis,
power to the CPT is taken directly from the
B-Phase of bus bar.  The Primary fusing
described in SUBSECTION 2-3-2 provides
protection to the CPT.

---WARNING---

Before preforming any maintenance
on the control power transformer,
remove all power to the panel at the
source.

2-3-3 SECONDARY POWER SWITCH

The secondary power switch provides a
convenient way to remove power to the
downstream of the CPT (See Figure 2-3-
3.1).  In addition, the secondary power
switch acts to provide over-current
protection to the JCI100 Controller.  The
secondary power switch will 

trip to

center

 in the event of an over-current or

magnetic trip.  To reset the switch press it
to the “On” position.

--Warning--

Even if the secondary power switch is
switched to the off position line
voltage will still be present on the
primary side of the transformer.

---Notice----

If the secondary power switch
continues to trip to center, remove all
power to the panel at the main device
& check primary fusing and all termina-
tion connection in the structure.

2-3-4 LINE FILTER

The 5X Control Chassis, Pow-R-Command
100 Relay Cabinet, and Pow-R-Command
100 Control Cabinet all contain a line filter
on the secondary side of the transformer.
The line filter is physically located directly
behind the secondary power switch.
Generally speaking, the purpose of the line
filter is to cleanse the power being fed to
the JCI100.  Very little to no maintenance is
ever required on the line filter.  Simply know
that the line filter is fed from the secondary
power switch & control power transformer.

Figure 2-3-1.2: Exposes Black Fuse

Cover

Figure 2-3-1.1: Primary Fuse Cover

Plate

Figure 2-3-3.1: Manual On Off Switch

Содержание Cutler-Hammer Pow-R-Command JCI-100

Страница 1: ...IL01412006E For More Information visit www cutler hammer com November 2002 Pow R CommandTM PRCTM JCI 100 Controller Installation Leaflet Pow R Command Panelboard JCI100...

Страница 2: ...particular purpose Pow R CommandTM PRCTM and Smart BreakerTM are trademarks of Eaton s Cutler Hammer All other products or software names referenced here in are trademarks or registered trademarks of...

Страница 3: ...O BTB 9 2 8 CONTROL CABINET 9 2 8 1 SMART BREAKER CONNECTION IN A CONTROL CABINET 9 2 8 2 RELAY TERMINATION ADAPTER BOARD 10 2 9 RELAY CABINET 10 SECTION 3 DISTRIBUTION SECTION 11 3 1INTRODUCTION 11 3...

Страница 4: ...UCTION The PRC enclosure with the JCI 100 Controller Here after JCI100 panelboard is a flexible cost effective compact lighting and load control system that can be very easily customized to address a...

Страница 5: ...JCI100 Controller is capable of and operating the BABR BABRS GHBS GHQRS Smart Breaker models Instructions unique to a particular Smart Breaker will be called out separately in this document In additio...

Страница 6: ...chassis The unneeded wire lead will be terminated and capped before shipment When the using the 5X Control Chassis power to the CPT is taken directly from the B Phase of bus bar The Primary fusing de...

Страница 7: ...e to do so may cause damage to the equipment 2 5 1 INCOMING POWER PORT Located in the lower right corner of the RIB are two white power connectors These connectors are suited to the connector found on...

Страница 8: ...instructions on connecting Smart Breakers to the BTB BTB s are not used in either the Pow R Command Control Cabinet nor the Pow R Command Relay Cabinet Figure 2 6 1 Breaker Termination Boards NOTICE T...

Страница 9: ...for the connection DO NOT force the connection If the connection is not made with minor pressure rotate the pigtail connector 180 degrees and reapply Forcing the connection may cause damage to the un...

Страница 10: ...on a Relay Termination Adapter Board in a control cabinet 2 9 RELAY CABINET The Pow R Command 100 Relay Cabinet contains all of the same parts and functions as the Pow R Command 100 Control Cabinet Ho...

Страница 11: ...existing panelboards Contact your Cutler Hammer representative for information on retrofitting panelboards to use Smart Breakers The JCI100 is designed to control the 1 Bolt On BABR BABRS 120 240V ac...

Страница 12: ...he main breaker handle can be used to Open and Close the remotely controlled contact To identify status of the remotely controlled contact there is a visual status window located adjacent to the main...

Страница 13: ...omponents disconnect power at the Secondary Power Switch Failure to do so can cause damage to the equipment 4 1 2 FACTORY TEST PORT This port is used for connecting the technician s hand held programm...

Страница 14: ...to the JCI100 NOTICE Both the RIB and RTB boards have terminals labeled SHLD Shield These are intended to be the Shield connections for a standard RS 485 network The JCI N2 Bus carries a 2 9 Volt ref...

Страница 15: ...ion To set the address move the switches with the combined added weighting to the Up position For example to set an address of 129 hexadecimal move switches 1 and 8 128 1 to the up position caution Th...

Страница 16: ...ment damage or personal injury Notice While circuit breaker panels are operable without actually energizing high voltage circuits relay panels do not offer this convenience To test a system without en...

Страница 17: ...PRC100 BREAKER RELAY 20 STATUS BI 21 0x14 On Off PRC100 BREAKER RELAY 21 STATUS BI 22 0x15 On Off PRC100 BREAKER RELAY 22 STATUS BI 23 0x16 On Off PRC100 BREAKER RELAY 23 STATUS BI 24 0x17 On Off PRC1...

Страница 18: ...0 BREAKER RELAY 20 CONTROL BO 21 0x14 On Off PRC100 BREAKER RELAY 21 CONTROL BO 22 0x15 On Off PRC100 BREAKER RELAY 22 CONTROL BO 23 0x16 On Off PRC100 BREAKER RELAY 23 CONTROL BO 24 0x17 On Off PRC10...

Страница 19: ...Handles of the Smart Breakers are in the On position If the Main Handle is left in the Off position the remote operation portion of the Smart Breaker will function but electrical flow will not be pre...

Страница 20: ...l a signal is sent to change them This means that if a Smart Breaker is commanded to the On state and the controller losses power the Smart Breaker will stay in that state until the controller is back...

Страница 21: ...ip PA 15108 United States tel 1800 525 2000 www cutler hammer com 2002 Eaton Corporation All Rights Reserved Printed In USA Form No IL01412006E UL NEC are trademarks of their respective companies Inst...

Отзывы: