Installation Leaflet
Page 2 Effective: november 2002
Pow-R-Command
JCI-100 Controller
IL01412006E
For More Information visit www.cutler-hammer.com
Pow-R-Command
TM
(PRC
TM
) and this manual
are copyright materials. No part of Pow-R-
Command products or its documentation may
be reproduced, adapted, or translated in any
manner without prior written permission of
Eaton’s Cutler-Hammer.
The information provided in this manual is
current as of the publishing date. It is,
however, subject to change without notice.
Eaton’s Cutler-Hammer makes no warranty
with regard to this material, including, but not
limited to, the implied warranties of mer-
chantability and fitness for a particular
purpose.
Pow-R-Command
TM
, PRC
TM
, and Smart
Breaker
TM
are trademarks of Eaton’s Cutler-
Hammer.
All other products or software names
referenced here in are trademarks or
registered trademarks of their respective
owners.
Before energizing a panelboard
containing a JCI-100 Controller, make
sure the BROWN neutral wire is
connected to the neutral pad or bar.
Failure to do so may cause personal
injury or even death.
© Copyright 2002 Eaton Corporation. All rights reserved.
The instructions and prescribed procedures in this User Manual do not purport to cover all possible contingencies that may arise during
installation, start-up, operation, or maintenance, or all details and variations of the system. If further information is required regarding a
particular installation, start-up, operation, or maintenance, please contact your local Cutler-Hammer representative.