SECTION 2: SYSTEM COMPONENTS

2-1 INTRODUCTION

The flexible JCI100 is primarily designed to
provide discrete lighting control.  However,
its flexibility also makes it ideal for other
energy management functions.

Through its ability to be controlled directly by
the Metasys system, the JCI100 can control
a variety of loads beyond simple lighting.
Some examples are fans, chillers, and other
heavy energy consumers that you may wish
to disable “with a flip of the switch.”

--notice--

For clarification purposes, when the
word load is used in this manual or
during any discussion of the system, it
represents an output, such as a relay
or circuit breaker.

2-2 SUPPORTED INSTALLATIONS

The JCI100 is an integrated panelboard
controller (See Figure 2-2.1).  An optional
installation using the Pow-R-Command
Control Cabinet and pigtails to connect to
Smart Breakers in adjacent panelboards is
also possible. Consult with your local Cutler-
Hammer Representative concerning any
nonstandard applications.

The Pow-R-Command 100 JCI100 Controller
is capable of  and operating the BABR,
BABRS, GHBS, & GHQRS Smart Breaker
models.  Instructions unique to a particular
Smart Breaker will be called out separately
in this document.

In addition to the use of Smart Breakers, the
JCI100 is capable of controlling latching
relays.  This is done by mounting the JCI100
in a Pow-R-Command 100 Relay Cabinet.
Figure 2-2.2 illustrates the JCI100 In a Relay
Cabinet.

2-3  PANELBOARD APPLICATIONS

When the JCI100 is used for panelboard
applications, the physical card will reside in
a 5X Control Chassis (Figure 2-3.1).  The
5X Control Chassis contains six primary
pieces.  All components are contained in an
enclosure suited to Class 2 voltage.  These
primary components are the primary fusing,
control power transformer, secondary
power switch, and line filter.  All
components are described in further detail
in the proceeding SUBSECTIONS of this
document.

It must be noted that the 5X control chassis,
Pow-R-Command Control Cabinet, and
Pow-R-Command Relay Cabinet use many
of the standard components.  This  includes
the primary fusing, control power
transformer, secondary power switch, and
line filter.  Those parts that are different are
called out in this document in the
proceeding SECTIONS and SUBSECTIONS.

Figure 2-2.2: JCI100 In Relay Cabinet

Figure 2-3.1: 5X Control Chassis

Figure 2-2.1: JCI100 In Panelboard

Содержание Cutler-Hammer Pow-R-Command JCI-100

Страница 1: ...IL01412006E For More Information visit www cutler hammer com November 2002 Pow R CommandTM PRCTM JCI 100 Controller Installation Leaflet Pow R Command Panelboard JCI100...

Страница 2: ...particular purpose Pow R CommandTM PRCTM and Smart BreakerTM are trademarks of Eaton s Cutler Hammer All other products or software names referenced here in are trademarks or registered trademarks of...

Страница 3: ...O BTB 9 2 8 CONTROL CABINET 9 2 8 1 SMART BREAKER CONNECTION IN A CONTROL CABINET 9 2 8 2 RELAY TERMINATION ADAPTER BOARD 10 2 9 RELAY CABINET 10 SECTION 3 DISTRIBUTION SECTION 11 3 1INTRODUCTION 11 3...

Страница 4: ...UCTION The PRC enclosure with the JCI 100 Controller Here after JCI100 panelboard is a flexible cost effective compact lighting and load control system that can be very easily customized to address a...

Страница 5: ...JCI100 Controller is capable of and operating the BABR BABRS GHBS GHQRS Smart Breaker models Instructions unique to a particular Smart Breaker will be called out separately in this document In additio...

Страница 6: ...chassis The unneeded wire lead will be terminated and capped before shipment When the using the 5X Control Chassis power to the CPT is taken directly from the B Phase of bus bar The Primary fusing de...

Страница 7: ...e to do so may cause damage to the equipment 2 5 1 INCOMING POWER PORT Located in the lower right corner of the RIB are two white power connectors These connectors are suited to the connector found on...

Страница 8: ...instructions on connecting Smart Breakers to the BTB BTB s are not used in either the Pow R Command Control Cabinet nor the Pow R Command Relay Cabinet Figure 2 6 1 Breaker Termination Boards NOTICE T...

Страница 9: ...for the connection DO NOT force the connection If the connection is not made with minor pressure rotate the pigtail connector 180 degrees and reapply Forcing the connection may cause damage to the un...

Страница 10: ...on a Relay Termination Adapter Board in a control cabinet 2 9 RELAY CABINET The Pow R Command 100 Relay Cabinet contains all of the same parts and functions as the Pow R Command 100 Control Cabinet Ho...

Страница 11: ...existing panelboards Contact your Cutler Hammer representative for information on retrofitting panelboards to use Smart Breakers The JCI100 is designed to control the 1 Bolt On BABR BABRS 120 240V ac...

Страница 12: ...he main breaker handle can be used to Open and Close the remotely controlled contact To identify status of the remotely controlled contact there is a visual status window located adjacent to the main...

Страница 13: ...omponents disconnect power at the Secondary Power Switch Failure to do so can cause damage to the equipment 4 1 2 FACTORY TEST PORT This port is used for connecting the technician s hand held programm...

Страница 14: ...to the JCI100 NOTICE Both the RIB and RTB boards have terminals labeled SHLD Shield These are intended to be the Shield connections for a standard RS 485 network The JCI N2 Bus carries a 2 9 Volt ref...

Страница 15: ...ion To set the address move the switches with the combined added weighting to the Up position For example to set an address of 129 hexadecimal move switches 1 and 8 128 1 to the up position caution Th...

Страница 16: ...ment damage or personal injury Notice While circuit breaker panels are operable without actually energizing high voltage circuits relay panels do not offer this convenience To test a system without en...

Страница 17: ...PRC100 BREAKER RELAY 20 STATUS BI 21 0x14 On Off PRC100 BREAKER RELAY 21 STATUS BI 22 0x15 On Off PRC100 BREAKER RELAY 22 STATUS BI 23 0x16 On Off PRC100 BREAKER RELAY 23 STATUS BI 24 0x17 On Off PRC1...

Страница 18: ...0 BREAKER RELAY 20 CONTROL BO 21 0x14 On Off PRC100 BREAKER RELAY 21 CONTROL BO 22 0x15 On Off PRC100 BREAKER RELAY 22 CONTROL BO 23 0x16 On Off PRC100 BREAKER RELAY 23 CONTROL BO 24 0x17 On Off PRC10...

Страница 19: ...Handles of the Smart Breakers are in the On position If the Main Handle is left in the Off position the remote operation portion of the Smart Breaker will function but electrical flow will not be pre...

Страница 20: ...l a signal is sent to change them This means that if a Smart Breaker is commanded to the On state and the controller losses power the Smart Breaker will stay in that state until the controller is back...

Страница 21: ...ip PA 15108 United States tel 1800 525 2000 www cutler hammer com 2002 Eaton Corporation All Rights Reserved Printed In USA Form No IL01412006E UL NEC are trademarks of their respective companies Inst...