background image

Installation Leaflet

Page 14       Effective: November 2002

Pow-R-Command

JCI-100 Controller

IL01412006E 

                                                 For More Information visit www.cutler-hammer.com

4-2 NETWORK TERMINATIONS

The JCI100 does not have any means of
directly connecting to the N2 bus wiring.
This topic is discussed here to provide
continuity.  The network wiring is
terminated to the appropriate carrier board.
This would be the RIB in a 5X chassis or to
the RTB in the Control Cabinet or Relay
Cabinet.  Figure 5-2.1 is provided to briefly
illustrate the network connection to the RIB.
Figure 5-2.2 is provided to briefly illustrate
the network connection in a Relay Cabinet
or Control Cabinet.

The JCI100 also lacks any on-board Bias
and Termination facilities for the N2 Bus.  If
either must be applied, they must be done
as adjacent components to the JCI100.

        

---NOTICE---

Both the RIB and RTB boards have
terminals labeled “SHLD” (Shield).
These are intended to be the Shield
connections for a standard RS-485
network.  The JCI N2 Bus carries a 2.9
Volt reference signal on this
conductor; therefore the SHLD
terminal should never be connected
to a chassis ground point.  Refer to
JCI N2 wiring specification for more
information.

Figure 4-2.1: N2 Network Connection Using Shielded Twisted-Pair Network Cable

In 5X Control Chassis

-

SHLD

Network In:

+

JCI100
 Mounted In 5X Control
Chassis

5X Control Chassis Mounted In
Cutler-Hammer Panelboard

N2 Network
Using Shielded Twisted
Pair Network Cable

Network In

Network Out: +

-

SHLD

Network Out

Shield Conductors
Spliced Together

-

Figure 4-2.2: N2 Network Connection Using Shielded Twisted-Pair Network Cable In Relay Cabinet & Control Cabinet

IN

IN

SHLD

OUT

OUT

SHLD

SEC SEL

GND

TB1

IN

IN

SHLD

OUT

OUT

SHLD

GND

GND

TB2

Local Network

Main Network

+

SHLD

+

SHLD

-

Network Connection in
To Relay Termination Board

Network In

Network Out

Содержание Cutler-Hammer Pow-R-Command JCI-100

Страница 1: ...IL01412006E For More Information visit www cutler hammer com November 2002 Pow R CommandTM PRCTM JCI 100 Controller Installation Leaflet Pow R Command Panelboard JCI100...

Страница 2: ...particular purpose Pow R CommandTM PRCTM and Smart BreakerTM are trademarks of Eaton s Cutler Hammer All other products or software names referenced here in are trademarks or registered trademarks of...

Страница 3: ...O BTB 9 2 8 CONTROL CABINET 9 2 8 1 SMART BREAKER CONNECTION IN A CONTROL CABINET 9 2 8 2 RELAY TERMINATION ADAPTER BOARD 10 2 9 RELAY CABINET 10 SECTION 3 DISTRIBUTION SECTION 11 3 1INTRODUCTION 11 3...

Страница 4: ...UCTION The PRC enclosure with the JCI 100 Controller Here after JCI100 panelboard is a flexible cost effective compact lighting and load control system that can be very easily customized to address a...

Страница 5: ...JCI100 Controller is capable of and operating the BABR BABRS GHBS GHQRS Smart Breaker models Instructions unique to a particular Smart Breaker will be called out separately in this document In additio...

Страница 6: ...chassis The unneeded wire lead will be terminated and capped before shipment When the using the 5X Control Chassis power to the CPT is taken directly from the B Phase of bus bar The Primary fusing de...

Страница 7: ...e to do so may cause damage to the equipment 2 5 1 INCOMING POWER PORT Located in the lower right corner of the RIB are two white power connectors These connectors are suited to the connector found on...

Страница 8: ...instructions on connecting Smart Breakers to the BTB BTB s are not used in either the Pow R Command Control Cabinet nor the Pow R Command Relay Cabinet Figure 2 6 1 Breaker Termination Boards NOTICE T...

Страница 9: ...for the connection DO NOT force the connection If the connection is not made with minor pressure rotate the pigtail connector 180 degrees and reapply Forcing the connection may cause damage to the un...

Страница 10: ...on a Relay Termination Adapter Board in a control cabinet 2 9 RELAY CABINET The Pow R Command 100 Relay Cabinet contains all of the same parts and functions as the Pow R Command 100 Control Cabinet Ho...

Страница 11: ...existing panelboards Contact your Cutler Hammer representative for information on retrofitting panelboards to use Smart Breakers The JCI100 is designed to control the 1 Bolt On BABR BABRS 120 240V ac...

Страница 12: ...he main breaker handle can be used to Open and Close the remotely controlled contact To identify status of the remotely controlled contact there is a visual status window located adjacent to the main...

Страница 13: ...omponents disconnect power at the Secondary Power Switch Failure to do so can cause damage to the equipment 4 1 2 FACTORY TEST PORT This port is used for connecting the technician s hand held programm...

Страница 14: ...to the JCI100 NOTICE Both the RIB and RTB boards have terminals labeled SHLD Shield These are intended to be the Shield connections for a standard RS 485 network The JCI N2 Bus carries a 2 9 Volt ref...

Страница 15: ...ion To set the address move the switches with the combined added weighting to the Up position For example to set an address of 129 hexadecimal move switches 1 and 8 128 1 to the up position caution Th...

Страница 16: ...ment damage or personal injury Notice While circuit breaker panels are operable without actually energizing high voltage circuits relay panels do not offer this convenience To test a system without en...

Страница 17: ...PRC100 BREAKER RELAY 20 STATUS BI 21 0x14 On Off PRC100 BREAKER RELAY 21 STATUS BI 22 0x15 On Off PRC100 BREAKER RELAY 22 STATUS BI 23 0x16 On Off PRC100 BREAKER RELAY 23 STATUS BI 24 0x17 On Off PRC1...

Страница 18: ...0 BREAKER RELAY 20 CONTROL BO 21 0x14 On Off PRC100 BREAKER RELAY 21 CONTROL BO 22 0x15 On Off PRC100 BREAKER RELAY 22 CONTROL BO 23 0x16 On Off PRC100 BREAKER RELAY 23 CONTROL BO 24 0x17 On Off PRC10...

Страница 19: ...Handles of the Smart Breakers are in the On position If the Main Handle is left in the Off position the remote operation portion of the Smart Breaker will function but electrical flow will not be pre...

Страница 20: ...l a signal is sent to change them This means that if a Smart Breaker is commanded to the On state and the controller losses power the Smart Breaker will stay in that state until the controller is back...

Страница 21: ...ip PA 15108 United States tel 1800 525 2000 www cutler hammer com 2002 Eaton Corporation All Rights Reserved Printed In USA Form No IL01412006E UL NEC are trademarks of their respective companies Inst...

Отзывы: