background image

Installation Leaflet

Page 7         Effective: November 2002

Pow-R-Command

JCI-100 Controller

IL01412006E 

                                                 For More Information visit www.cutler-hammer.com

2-4 JCI100

The JCI100 (See Figure 2-4.1) provides an
interface between the Johnson Control’s
network and the Cutler-Hammer panelboard.
The JCI100’s only function is to operate as a
slave to the Metasys controller.  Conse-
quently it has no inherent intelligence or
storage capacity.  In addition, the JCI100
does not provide any ability to terminate
switch inputs/outputs to it.  The components
and functions of the JCI100 are further
described in section 4 of this document.

----CAUTION---

Remove all power to the 5X Chassis at
the secondary power switch before
installing or removing the JCI100.
Failure to do so may cause severe
damage to the unit and may void any
existing warranty.

Figure 2-4: JCI100

2-5 RAIL INTERFACE BOARD (RIB)

The RIB is a printed circuit board that is
anchored to the back of the 5X Control
Chassis only (See Figure 2-5.1).  The RIB
serves as the central point for all communi-
cations and power, and is used only in the
5X control chassis.  The RIB provides
termination/connection points for incoming
power, a JCI100, incoming & outgoing
network, Breaker Termination Boards, and a
breaker selection jumper. Figure 2-5.2
illustrates the various connections on a RIB.
The following SUBSECTIONS provide further
detail on the terminations & connections
found on the RIB.

CAUTION

The proceeding subsections cover
parts that are relatively fragile.  Little
pressure is required when making
connections to the following parts.
Forcing any connections can cause
damage to the equipment.  Further,
before connecting or disconnecting
any of the following parts, switch the
secondary power switch to the “Off”
position.  Failure to do so may cause
damage to the equipment.

2-5-1 INCOMING POWER PORT

Located in the lower right corner of the RIB
are two white power connectors.  These
connectors are suited to the connector
found on the wire leads extending from the
line filter.  Both ports are electrically
interconnected, which means that it does not
make a difference which connection point is
used.  However, for consistency it is best to
use the top connector. The connectors on
the RIB have a limiter device; the limiter
device assures that the connection is made
in the proper way.

2-5-2 JCI100 CONNECTION PORTS

Located on each side of the RIB are two
long white columns.  These columns are the
connection ports for the JCI100 controller.
These ports match the pinout configuration
and dimensions of the connections found on
the back of the JCI100.

2-5-3 INCOMING & OUTGOING
          NETWORK CONNECTION

Located in the upper right of each RIB are
two pull-a-part terminal blocks used for
terminating the network wire.  Both terminal
blocks are electrically interconnected
meaning that it does not matter which
terminal block is used for incoming or
outgoing network connection.

2-5-4 BTB CONNECTION PORTS

On the upper right and left corner of each
RIB is a connection port for a single Breaker
Termination Board.  To secure the connec-
tion there are two metal prongs, which latch
over the connector on the Breaker Termina-
tion Board once it is inserted into the
connectors found on the RIB.  When joining
these two parts together, make sure to pull
these metal prongs over the connector on
the Breaker Termination Board.  When
breaking this connection, gently push pack
on the metal prongs and pull the connectors
on the Breaker Termination Boards away.

Ribbon Cable Connections From BTB’s

JCI100 Connection Points

Network In

Network Out

Power In From
Line Filter

Selection Jumper
For Number of
Controlled Breakers
In A Panel

Figure 2-4.1: Connection Points On A RIB

Figure 2-4.1: Rail interface Board

Содержание Cutler-Hammer Pow-R-Command JCI-100

Страница 1: ...IL01412006E For More Information visit www cutler hammer com November 2002 Pow R CommandTM PRCTM JCI 100 Controller Installation Leaflet Pow R Command Panelboard JCI100...

Страница 2: ...particular purpose Pow R CommandTM PRCTM and Smart BreakerTM are trademarks of Eaton s Cutler Hammer All other products or software names referenced here in are trademarks or registered trademarks of...

Страница 3: ...O BTB 9 2 8 CONTROL CABINET 9 2 8 1 SMART BREAKER CONNECTION IN A CONTROL CABINET 9 2 8 2 RELAY TERMINATION ADAPTER BOARD 10 2 9 RELAY CABINET 10 SECTION 3 DISTRIBUTION SECTION 11 3 1INTRODUCTION 11 3...

Страница 4: ...UCTION The PRC enclosure with the JCI 100 Controller Here after JCI100 panelboard is a flexible cost effective compact lighting and load control system that can be very easily customized to address a...

Страница 5: ...JCI100 Controller is capable of and operating the BABR BABRS GHBS GHQRS Smart Breaker models Instructions unique to a particular Smart Breaker will be called out separately in this document In additio...

Страница 6: ...chassis The unneeded wire lead will be terminated and capped before shipment When the using the 5X Control Chassis power to the CPT is taken directly from the B Phase of bus bar The Primary fusing de...

Страница 7: ...e to do so may cause damage to the equipment 2 5 1 INCOMING POWER PORT Located in the lower right corner of the RIB are two white power connectors These connectors are suited to the connector found on...

Страница 8: ...instructions on connecting Smart Breakers to the BTB BTB s are not used in either the Pow R Command Control Cabinet nor the Pow R Command Relay Cabinet Figure 2 6 1 Breaker Termination Boards NOTICE T...

Страница 9: ...for the connection DO NOT force the connection If the connection is not made with minor pressure rotate the pigtail connector 180 degrees and reapply Forcing the connection may cause damage to the un...

Страница 10: ...on a Relay Termination Adapter Board in a control cabinet 2 9 RELAY CABINET The Pow R Command 100 Relay Cabinet contains all of the same parts and functions as the Pow R Command 100 Control Cabinet Ho...

Страница 11: ...existing panelboards Contact your Cutler Hammer representative for information on retrofitting panelboards to use Smart Breakers The JCI100 is designed to control the 1 Bolt On BABR BABRS 120 240V ac...

Страница 12: ...he main breaker handle can be used to Open and Close the remotely controlled contact To identify status of the remotely controlled contact there is a visual status window located adjacent to the main...

Страница 13: ...omponents disconnect power at the Secondary Power Switch Failure to do so can cause damage to the equipment 4 1 2 FACTORY TEST PORT This port is used for connecting the technician s hand held programm...

Страница 14: ...to the JCI100 NOTICE Both the RIB and RTB boards have terminals labeled SHLD Shield These are intended to be the Shield connections for a standard RS 485 network The JCI N2 Bus carries a 2 9 Volt ref...

Страница 15: ...ion To set the address move the switches with the combined added weighting to the Up position For example to set an address of 129 hexadecimal move switches 1 and 8 128 1 to the up position caution Th...

Страница 16: ...ment damage or personal injury Notice While circuit breaker panels are operable without actually energizing high voltage circuits relay panels do not offer this convenience To test a system without en...

Страница 17: ...PRC100 BREAKER RELAY 20 STATUS BI 21 0x14 On Off PRC100 BREAKER RELAY 21 STATUS BI 22 0x15 On Off PRC100 BREAKER RELAY 22 STATUS BI 23 0x16 On Off PRC100 BREAKER RELAY 23 STATUS BI 24 0x17 On Off PRC1...

Страница 18: ...0 BREAKER RELAY 20 CONTROL BO 21 0x14 On Off PRC100 BREAKER RELAY 21 CONTROL BO 22 0x15 On Off PRC100 BREAKER RELAY 22 CONTROL BO 23 0x16 On Off PRC100 BREAKER RELAY 23 CONTROL BO 24 0x17 On Off PRC10...

Страница 19: ...Handles of the Smart Breakers are in the On position If the Main Handle is left in the Off position the remote operation portion of the Smart Breaker will function but electrical flow will not be pre...

Страница 20: ...l a signal is sent to change them This means that if a Smart Breaker is commanded to the On state and the controller losses power the Smart Breaker will stay in that state until the controller is back...

Страница 21: ...ip PA 15108 United States tel 1800 525 2000 www cutler hammer com 2002 Eaton Corporation All Rights Reserved Printed In USA Form No IL01412006E UL NEC are trademarks of their respective companies Inst...

Отзывы: