---CAUTION----

Pigtail connections, to the control
cabinet and Smart Breaker, can only fit
one way.  Only minor pressure is
required for the connection.  DO NOT
force the connection.  If the connection
is not made with minor pressure,
rotate the pigtail connector 180
degrees and reapply.   Forcing the
connection may cause damage to the
unit and void any existing warranty.

Installation Leaflet

Page 9         Effective: November 2002

Pow-R-Command

JCI-100 Controller

IL01412006E  

                                                For More Information visit www.cutler-hammer.com

2-7 SMART BREAKER CONNECTION TO
BTB

The JCI100 can control GHBS, BABR,
BABRS, & GHQRS Smart Breakers.  To
connect to the BTB a pigtail extends from the
Smart Breaker with a specialized connector
at one end, which is suited to connect to the
BTB (See Figure 4-4.1).  Three points must
be noted about the pigtail and connection to
the BTB.

 1. The pigtail of the BABR, BABRS, &

GHQRS is integral to the Smart Breaker.

 2. The pigtail of the GHBS is a separate

component.  One end of the GHBS pigtail
contains a connector suited to connect
to  the Smart Breaker.  The opposing end

      contains a connector suited to connect

to the BTB.

 3. Double-pole Smart Breakers have a

joined pigtail meaning that there is only
one connector.  This means that a
double-pole Smart Breaker will only
occupy one position on a BTB.  Though
the double-pole Smart Breaker will
occupy two positions on the panel
schedule, it will only be controlled by one
point on the BTB.  This is important to
note when diagnosing problems.

---CAUTION----

Pigtail connections, to the BTB or
Smart Breaker, can only fit one way.
Only minor pressure is required for
the connection.  DO NOT force the
connection.  If the connection is not
made with minor pressure, rotate the
pigtail connector 180 degrees and
reapply.  Forcing the connection may
cause damage to the unit and void any
existing warranty.

2-8 CONTROL CABINET

The control cabinet (See Figure 2-8) is used
primarily to retrofit a facility with the abilities
of the JCI100.  However, the control cabinet
may also be used if several Smart Breakers
need to be controlled in multiple panels and
the amount of control needed between the
multiple panels does not exceed the
capability of a single JCI100.    Because the
Control cabinet uses many of the same parts
as the 5X Control Chassis, there is little
discussion of the control cabinet in this
document.

              

Figure 2-8 Control Cabinet

2-8-1 SMART BREAKER CONNECTION IN A
CONTROL CABINET

As previously mentioned neither BTB’s nor a
RIB are used when a JCI100 is placed in a
control cabinet.  This is due to the fact that
the Control Cabinet integrates the functions
of a BTB and RIB.  Each control cabinet
contains a large printed circuit board (known
as a Relay Termination Board or RTB) with
connection points along both sides num-
bered identical to a panel schedule (See
Figure 2-8-1.1).  From each of these points a
pigtail can be run to the panels containing
Smart Breakers.  Like the Smart Breaker
pigtails, the control cabinet pigtail has a
connection on one end designed for the
points in the control cabinet.  The connection
on the opposing end is a connector suited
for the Smart Breaker.  The pigtail itself can
come a variety of lengths, but may not
exceed 150-feet.  From the control cabinet
the pigtail must be run to the panelboard
containing Smart Breakers per NEC
regulations.

Control Circuit Numbers

Figure 2-8-1.1 Control Cabinet Position
                         Numbering

Содержание Cutler-Hammer Pow-R-Command JCI-100

Страница 1: ...IL01412006E For More Information visit www cutler hammer com November 2002 Pow R CommandTM PRCTM JCI 100 Controller Installation Leaflet Pow R Command Panelboard JCI100...

Страница 2: ...particular purpose Pow R CommandTM PRCTM and Smart BreakerTM are trademarks of Eaton s Cutler Hammer All other products or software names referenced here in are trademarks or registered trademarks of...

Страница 3: ...O BTB 9 2 8 CONTROL CABINET 9 2 8 1 SMART BREAKER CONNECTION IN A CONTROL CABINET 9 2 8 2 RELAY TERMINATION ADAPTER BOARD 10 2 9 RELAY CABINET 10 SECTION 3 DISTRIBUTION SECTION 11 3 1INTRODUCTION 11 3...

Страница 4: ...UCTION The PRC enclosure with the JCI 100 Controller Here after JCI100 panelboard is a flexible cost effective compact lighting and load control system that can be very easily customized to address a...

Страница 5: ...JCI100 Controller is capable of and operating the BABR BABRS GHBS GHQRS Smart Breaker models Instructions unique to a particular Smart Breaker will be called out separately in this document In additio...

Страница 6: ...chassis The unneeded wire lead will be terminated and capped before shipment When the using the 5X Control Chassis power to the CPT is taken directly from the B Phase of bus bar The Primary fusing de...

Страница 7: ...e to do so may cause damage to the equipment 2 5 1 INCOMING POWER PORT Located in the lower right corner of the RIB are two white power connectors These connectors are suited to the connector found on...

Страница 8: ...instructions on connecting Smart Breakers to the BTB BTB s are not used in either the Pow R Command Control Cabinet nor the Pow R Command Relay Cabinet Figure 2 6 1 Breaker Termination Boards NOTICE T...

Страница 9: ...for the connection DO NOT force the connection If the connection is not made with minor pressure rotate the pigtail connector 180 degrees and reapply Forcing the connection may cause damage to the un...

Страница 10: ...on a Relay Termination Adapter Board in a control cabinet 2 9 RELAY CABINET The Pow R Command 100 Relay Cabinet contains all of the same parts and functions as the Pow R Command 100 Control Cabinet Ho...

Страница 11: ...existing panelboards Contact your Cutler Hammer representative for information on retrofitting panelboards to use Smart Breakers The JCI100 is designed to control the 1 Bolt On BABR BABRS 120 240V ac...

Страница 12: ...he main breaker handle can be used to Open and Close the remotely controlled contact To identify status of the remotely controlled contact there is a visual status window located adjacent to the main...

Страница 13: ...omponents disconnect power at the Secondary Power Switch Failure to do so can cause damage to the equipment 4 1 2 FACTORY TEST PORT This port is used for connecting the technician s hand held programm...

Страница 14: ...to the JCI100 NOTICE Both the RIB and RTB boards have terminals labeled SHLD Shield These are intended to be the Shield connections for a standard RS 485 network The JCI N2 Bus carries a 2 9 Volt ref...

Страница 15: ...ion To set the address move the switches with the combined added weighting to the Up position For example to set an address of 129 hexadecimal move switches 1 and 8 128 1 to the up position caution Th...

Страница 16: ...ment damage or personal injury Notice While circuit breaker panels are operable without actually energizing high voltage circuits relay panels do not offer this convenience To test a system without en...

Страница 17: ...PRC100 BREAKER RELAY 20 STATUS BI 21 0x14 On Off PRC100 BREAKER RELAY 21 STATUS BI 22 0x15 On Off PRC100 BREAKER RELAY 22 STATUS BI 23 0x16 On Off PRC100 BREAKER RELAY 23 STATUS BI 24 0x17 On Off PRC1...

Страница 18: ...0 BREAKER RELAY 20 CONTROL BO 21 0x14 On Off PRC100 BREAKER RELAY 21 CONTROL BO 22 0x15 On Off PRC100 BREAKER RELAY 22 CONTROL BO 23 0x16 On Off PRC100 BREAKER RELAY 23 CONTROL BO 24 0x17 On Off PRC10...

Страница 19: ...Handles of the Smart Breakers are in the On position If the Main Handle is left in the Off position the remote operation portion of the Smart Breaker will function but electrical flow will not be pre...

Страница 20: ...l a signal is sent to change them This means that if a Smart Breaker is commanded to the On state and the controller losses power the Smart Breaker will stay in that state until the controller is back...

Страница 21: ...ip PA 15108 United States tel 1800 525 2000 www cutler hammer com 2002 Eaton Corporation All Rights Reserved Printed In USA Form No IL01412006E UL NEC are trademarks of their respective companies Inst...

Отзывы: