Maintenance

A maintenance program should be established as soon as the 

controller has been installed and put into operation . After the 

controller has been inspected a number of times at monthly  

intervals and the conditions noted, the frequency of inspection  

can be increased or decreased to suit the conditions found .
Before attempting maintenance, consult the order specific  

drawings and instructions supplied with the controller .

Insulation level

The insulation resistance between poles, and from each pole to 

ground, should be measured and recorded . It is not practical to 

specify an absolute value for this reading because it is dependent on 

other connected apparatus and conditions of service . However, any 

unusually low reading or abrupt reduction in a reading may indicate  

a possible source of trouble, and the cause should be investigated 

and corrected .

Fuses

Inspect the current limiting fuses after each relay initiated trip, 

because this is the most severe service to which they will be 

subjected . Check the fuse resistance, and compare with the value 

of a new fuse . A visual sign of an open fuse is provided by a pop-up 

indicator on the top of the fuse . If a fuse has blown due to a fault, 

it is likely that the other fuses experienced a similar overcurrent 

condition . In this case, Eaton recommends that all three fuses be 

replaced . Ensure that the replacement fuses are of the same rating 

and mounting configuration as those originally supplied .

Blown 

Fuse 

Indicator

Figure 24. Blown Fuse Indicator

Fuses can be removed by loosening the four nuts that secure the 

fuses to their mounting studs on the lower portion of the copper 

plate . The phase barriers on the lower fuse mountings can be 

removed if desired to ease access to the mounting studs and  

the nuts . The upper phase barriers are not removable . Installation  

is the reverse of removal . Bolt-in fuses must be torqued to  

25 lb-ft (33 Nm) .

• 

Remove nuts  

closest to fuse

• 

Remove lower  

nuts first

• 

Be careful when 

removing last nut  

from fuse as it may  

fall unless supported

Figure 25. Fuse Nuts

m

 caution

main fuses weigh 44 pounDs for the 400a-15bhcls-400.

Contactor

Inspect the contactor line and load fingers for signs of arcing or 

overheating . Replace as necessary . Inspect the mechanical interlock 

components attached to right side of the contactor main operating 

shaft and side sheets . Ensure that the lever is secure on the 

shaft and that the pivoting arm moves freely . Verify that the finger 

assemblies are in their neutral (horizontal) position before reinserting 

the contactor into the cell . No lubrication is required .
Refer to IB48051 for details of additional contactor operation and 

maintenance information .
Follow the steps below to remove the contactor from the starter 

cell . Installation is the reverse of the removal process . Note that the 

mechanical interlock mechanism on the side of the contactor must 

be reconnected before the contactor can be closed . The mechanism 

is weighted in such a manner that the contactor cannot operate until 

the interlock rod clevis is reconnected . 

Figure 26

 through 

Figure 29

 

illustrate the removal sequence .

1. 

Unplug control harness .

2. 

Remove bolt from hold-down bracket .

3. 

Unsnap pin collar from interlock rod clevis .

4. 

Remove pin from interlock rod clevis .

5. 

Withdraw contactor from cell .

Содержание AMPGARD

Страница 1: ...Installation 8 Handling 8 Storage 8 Mounting 8 Bus splicing 8 Power connections 8 Motor load cable termination 9 Control connections 9 Setting of adjustable protective devices 10 Pre startup checks 1...

Страница 2: ...of each controller Contained on this nameplate are the controller type and ratings as required by industry standards Also contained on this nameplate is the factory s general order number This number...

Страница 3: ...age Tripping burden 24 Vdc 48 and 96 Vdc 110 and 220 Vac 250 000 operations 24 48 96V 110 220V 50 60 Hz 80 rated coil voltage 1200 VA 400 VA 500 VA Ratings are based on full voltage starting of standa...

Страница 4: ...operated In the open position the switch isolates medium voltage from the main controller compartment allowing access to the controller for inspection and maintenance For standard applications the is...

Страница 5: ...in the isolating position See Figure 5 for location of barber poles The use of a flashlight will help in verifying the position of the barber poles Grounding Fingers 3 Barber Poles Indicating Shutter...

Страница 6: ...h the switch operating mechanism The second door must be closed before the main door is closed Both doors must be closed before the switch operator can be moved to the closed position Note N Attemptin...

Страница 7: ...Door Open Figure 12 LV Terminal Blocks LV Door Open A test plug and receptacle are typically supplied inside the low voltage section The receptacle is wired to the secondary of the controller control...

Страница 8: ...actory before shipment However vibration and mechanical stresses imposed by transit and installation can adversely affect mechanical interlocks and other adjustments therefore a final inspection is es...

Страница 9: ...shover at the load connections Motor Load Connections Figure 16 Motor Load Connections Shown With Optionally Supplied Lugs Removable Phase Barriers Figure 17 Close Up Motor Load Connections MV Conduit...

Страница 10: ...are connected per the Eaton drawings This is particularly essential in this class of equipment as the fuse ratings current transformers and overload protection are based on the characteristics of the...

Страница 11: ...d as follows Isolate and lock out all incoming power sources Open the isolation switch Open the medium voltage door Verify that the mechanical interlocks between the contactor and the handle mechanism...

Страница 12: ...ied Blown Fuse Indicator Figure 24 Blown Fuse Indicator Fuses can be removed by loosening the four nuts that secure the fuses to their mounting studs on the lower portion of the copper plate The phase...

Страница 13: ...y in both directions with an increase in resistance as the stabs engage the controller line fingers Inspect for any signs of mechanical wear or overheating To withdraw the removable portion 1 Remove t...

Страница 14: ...bus connections checked for tightness Remove the polyester barrier mounted immediately below the switch for access to the vertical bus connections refer to Figure 33 Verify the operation of the shutte...

Страница 15: ...back of the door preventing the door from opening with the switch closed In the unlikely event the switch malfunctions and cannot be opened it will be necessary to drill out the welds to allow access...

Страница 16: ...rved Printed in USA Publication No IB48050 Z12716 September 2012 Eaton is a registered trademark of Eaton Corporation All other trademarks are property of their respective owners Instruction Booklet I...

Отзывы: