Page 26
Technical Documentation EASYRO
®
Water Treatment Systems© 2015 easymetal GmbH.
This information is subject to copyright laws and may not be reproduced or changed without express written permission of easymetal GmbH.
The clean water outlet remains disconnected during the entire flushing process to avoid any
flushing residues from reaching the potable water tank.
Now plug the power plug of the system into the power socket. The system now starts the
flushing process and flushes the preservation solution from the membranes and into the sewer
drain/bucket. The flushing process duration is listed for each model in the following table.
After the flushing process, disconnect the system again from the mains power supply and connect
the clean water outlet with your tank.
Now reconnect the system to the mains power supply.
The system now starts with production and begins to fill the tank.
The initial start-up procedure is now completed.
FLUSHING PRESERVATION SOLUTION FROM THE MEMBRANES
The system is not yet connected to the mains power supply.
Unplug the clean water outlet from the tank and place the end into the sewer drain. If the tube
length should not be sufficient for the distance to the sewer drain, then take a bucket or similar
container instead.
Model
Flushing Time
EASYRO
®
60/120
Min. of 3 minutes
EASYRO
®
240
Min. of 5 minutes
EASYRO
®
480
Min. of 10 minutes
Clean water outlet
Sewer drain
Clean water outlet
EASYRO
Production
Con: 60
Maintenance:3489