background image

~ 57 ~

Fault information

Possible cause

Action

BYPASS 105% Over

Load

Output overload

protection during

off-grid to grid-tied

1. Check the output load and reduce the load
power.
2. If the failure is repeated, contact the
distributor or after-sales service center.

BYPASS 125% Over

Load

BYPASS 150% Over

Load

Output overload

protection during

off-grid to grid-tied

1. Check the output load and reduce the load
power.
2. If the failure is repeated, contact the
distributor or after-sales service center.

BYPASS 200% Over

Load

PV1 Over VOLT

The PV1 or PV2

voltage is higher than

the bus voltage.

1. Check whether the PV input end is normal.
2. Check whether the PV input configuration
exceeds the allowable range of inverter
protection parameters.
3. If there are no such problems, and the failure
persists, please contact the distributor or
after-sales service center.

PV2 Over VOLT

PV1 FAST Over

CURR

The average

instantaneous input

current of PV1 or PV2

is higher than the set

upper limit.

1. Check whether the PV input end is normal.
2. Check whether the PV input configuration
exceeds the allowable range of inverter
protection parameters.
3. If there are no such problems, and the failure
persists, please contact the distributor or
after-sales service center.

PV2 FAST Over

CURR

PV1 Over CURR
PV2 Over CURR

The average input

current of PV1 or PV2

is higher than the

upper limit.

1. Check whether the PV input end is normal.
2. Check whether the PV input configuration
exceeds the allowable range of inverter
protection parameters.
3. If there are no such problems, and the failure
persists after restarting the inverter, please
contact the distributor or after-sales service
center.

INSU.TO GROUND

IMPE.

Short circuit of PV

string to protective

earth, long humid

installation

environment of PV

string

1. Check whether the inverter is grounded
reliably.
2. Check whether the positive and negative
electrodes of the PV panel are short connected
with the ground wire.
3. Wait until the inverter recovers.
4. If the failure persists, please contact the
distributor or after-sales service center.

Содержание EAHI-6000-SL-S

Страница 1: ...tion scenarios 6 3 3 Operating modes 7 3 4 Operation status of inverter 9 3 5 External dimensions 10 Chapter 4 Inverter Storage and Inspection 14 4 1 Arrival inspection 14 4 2 Packing list of EAHI 600...

Страница 2: ...on 46 7 4 LED Fault display 46 Chapter 8 System Maintenance 48 8 1 Daily maintenance of inverter 48 8 2 Maintenance of inverter unused for long term 48 8 3 Powering off inverter 48 8 4 Battery mainten...

Страница 3: ...000 SL S 1 2 Applicable personnel This document is only applicable to the professionals who know local regulations and standards and electrical systems well and have specialized knowledge related to t...

Страница 4: ...onic devices to protect the inverter against static Any equipment damage or personnel injury caused by failure to install use or configure the inverter as required by this document is not the equipmen...

Страница 5: ...not equipped with a battery it is not recommended to use the BACK UP function The power consumption risk of the system caused thereon is excluded in the warranty of the equipment manufacturer DANGER...

Страница 6: ...onnected correctly and the voltage is within the allowable range Do not connect a single battery pack to more than one inverter otherwise the inverter may be damaged 2 5 Personnel requirements NOTE In...

Страница 7: ...aste Electrical and Electronic Equipment 2012 19 EU Registration Evaluation Authorization and Restriction of Chemicals EC No 1907 2006 Please contact the suppliers for more EU compliance statements RE...

Страница 8: ...lure If the photovoltaic system is not equipped with a battery it is not recommended to use the BACK UP function The power consumption risk of the system caused therefore is excluded from the warranty...

Страница 9: ...charging the battery and supplies excess energy to the domestic loads and the grid 2 If the power from the PV is less than the power of the backup load the battery supplies the power for the backup l...

Страница 10: ...omestic loads and the grid 2 If the power from the PV is not enough to the backup load the grid supplies the power required for the backup load and the domestic load 3 If the power from the PV is unav...

Страница 11: ...enters the fault mode 2 Self check mode Continuous self check initialization and so on before the inverter is started If the condition is met the inverter enters and starts to operate in the grid tie...

Страница 12: ...nd the off grid output function is not activated the inverter enters the waiting mode If the grid meets the grid tied requirement and the off grid output function is activated the inverter enters the...

Страница 13: ...verter 3 USB Firmware upgrade 4 PV1 PV1 input 5 PV1 PV1 input 6 No identification Buzzer hole 7 VENT VALVE Discharge the growing air from housing 8 RS485 RS485 communication with the upper computer 9...

Страница 14: ...12 Description of battery terminal at bottom No Name No Name 1 PACK 9 485 B 2 PACK 10 485 A 3 PACK 11 GND 4 PACK 12 GND 5 PACK 13 SW 6 PACK 14 SW 7 PACK 15 485 B reserved 8 PE 16 485 A reserved...

Страница 15: ...ed on the side of the inverter The nameplate indicates inverter information such as model important parameters certification marks and place of production etc and must not be damaged or covered Fig 3...

Страница 16: ...pect the following carefully 1 Check the external packing for damage deformation hole crack and other signs showing inverter damage If yes do not open the packing and contact the distributor 2 Check t...

Страница 17: ...nd two pins pin 4 pin 5 the rest is cut and 40mm external insulation and 5mm cable insulation removed on another end 2m long used to connect Home power supply with the kilo watt hour meter 1 11 Earth...

Страница 18: ...k matt finish 110 39 9 9 mm 1 4 Foundation bolt L50 30 22mm 2 5 Handled screw M4 30mm flange outer hexagon gasketed inner cross SUS304 screw 4 6 Expansion pipes and bolts M6 50mm installed on ground 2...

Страница 19: ...d must not be installed at frontward tilt or diagonally and horizontally During installation of the inverter the display panel should be aligned with line of sight to facilitate the operation The wiri...

Страница 20: ...pt away from lightning stroke The equipment adopts self cooling heat dissipation mode and should be installed in well ventilated environment in order to ensure good performance Install the equipment o...

Страница 21: ...ich can support the equipment weight Model EAHI 6000 SL S 5 EAHI 6000 SL S 10 EAHI 6000 SL S 15 Cell quantity 1 2 3 Weight kg 93 143 193 Dimension W H T mm 600 778 305 600 998 305 600 1218 305 Model E...

Страница 22: ...ard or backward tilting is not allowed in vertical installation The gap around the power supply must not be less than the following value Top Front Back Left wiring location Right 800mm 1000mm 35mm 60...

Страница 23: ...ter weight than the carrying capacity of the personnel 2 Please wear safety gloves to avoid injury 3 Ensure that the inverter is balanced to avoid falling during handling 5 2 2 System installation NOT...

Страница 24: ...o holes are on the same horizontal line Measure and make the line C vertical to the line A by the ruler and the level The line C is 561mm from the ground Locate the fixing screw holes of the hanging s...

Страница 25: ...f base support Tools screwdrivers and screws M4 8mm Before installation take down the upper and lower dust covers of the battery to avoid damaging the equipment during installation During installation...

Страница 26: ...4 8mm angle irons L50 30 22mm expansion pipes and bolts M6 50mm and expansion screw gasket SUS304 gasket Align the angle iron with the screw holes on the battery and fix the angle iron by the screws b...

Страница 27: ...onto the battery bottom and fix the angle iron by the expansion screws Fix the battery by the handled screws on its two sides after installation of each battery Check the battery for proper and firm...

Страница 28: ...the expansion screws Install the handing support on the power supply and tighten the hanging support screws align with the hanging support fastener and connect the power supply with the battery fix t...

Страница 29: ...e grid or provide the battery with enough capacity If the power is supplied only by PV largest single off grid load is generally less than 2KW No Component Description 1 PV String The PV string consis...

Страница 30: ...d Output L N PE EAHI 6000 SL S 5 6 mm2 PV1 PV2 PV Input EAHI 6000 SL S 3 4mm2 BAT EAHI 6000 SL S Stacked installation without addition 1 Install the insulated terminal for grid input AC load output PV...

Страница 31: ...wire with suitable length Remove 4mm insulating layer from the ground wire by the wire stripper for installing the ground wire terminal and install press the ground wire terminal by the crimping plie...

Страница 32: ...nected to the PV of the inverter and the negative electrode of the PV string is connected to the PV of the inverter Procedure 1 Disconnect all circuit breakers 2 Check the positive and negative polari...

Страница 33: ...id an AC circuit breaker should be installed between the inverter and the grid and the BACK UP The AC cable matches the L N and PE ports on the AC terminal during wiring If the cable is incorrectly co...

Страница 34: ...aker 3 Depends on loads 4 Depends on household loads and inverter capacity 5 30mA RCD Comply with local regulation 6 30mA RCD Comply with local regulation Note 1 If the battery is integrated with a re...

Страница 35: ...ditional DC breaker is required Note 2 The recommended values in the table are for reference only The actual values must comply with local standard and actual conditions Note 3 The rated current of br...

Страница 36: ...nt of on site power cables are lower than those recommended above the breakers specification should be considered to match the power cables in first priority Note 5 The AC port takes power from the gr...

Страница 37: ...wire strippers tape measures and cables L N PE Measure the distance between the distribution box or the load wiring terminal and the equipment by the tape measure and select the cable with suitable le...

Страница 38: ...rminals three adapter wire strippers tape measures and cables L N PE Make sure that the grid breaker is closed measure the distance from the distribution box by the tape measure and select the cable w...

Страница 39: ...installation location of the kilowatt hour meter and mark the hole location according to the screw hole of the kilowatt hour meter rail Drill the holes with more than 40mm depth by the electric drill...

Страница 40: ...click bang sound Gently press the crystal head buckle to insert the body into the crystal head and make contact with the RJ45 connector Twist the connection nut clockwise to the RJ45 connector with a...

Страница 41: ...isconnect the circuit breaker on the power grid side continue other further operation Double check whether the L N cable of the network cable is securely connected 6 4 2 Electricity Meter Configuratio...

Страница 42: ...ettings and the PT setting interface is displayed Press in the parameter interface to switch to Press SET to enter the baud rate and parity bit Settings Press to switch set the baud rate and check bit...

Страница 43: ...the and buttons on the meter to switch the display interface of the meter The specific introduction of the display interface can be found in the electricity meter manual 6 5 Communication end connecti...

Страница 44: ...power DRM4 The import power from the grid is 100 of the rated power but subject to the constraints from other active DRMS DRM5 The feed in power to the grid is 0 DRM6 The feed in power to the grid is...

Страница 45: ...gure below Boot Shutdown Tap Boot Shutdown to send the boot shutdown instruction to the inverter For Australia and New Zealand when the DRM state is DRM0 the Boot option will be prohibited Date Settin...

Страница 46: ...ect CT white wire to pin 6 or 7 8 of the RJ45 registered jack CT black wire to the pin 1 or 2 3 connect the communication of the kilo watt hour mete to the pin 5 of the RJ45 communication to the pin 4...

Страница 47: ...ription of signal indicator light Icon Name Function WIFI connection WIFI module communication connection success green long bright Bluetooth connection Bluetooth connection success green long bright...

Страница 48: ...he top running water lamp display Battery idle state when the power quantity is greater than 20 the power quantity will be displayed in the way of breathing light When the power is less than 20 the po...

Страница 49: ...Quiet The LED lights are always on the blue Off after the upgrade is complete Priority Upgrade fault alarm power display With an alarm indicator light the power is not displayed The power will be dis...

Страница 50: ...ain Once year 8 2 Maintenance of inverter unused for long term If the inverter has been not used for more than 7 days turn off the AC input PV input and battery input switches If the inverter has not...

Страница 51: ...to avoid the burns resulting from short circuit 2 Wear safety goggles and gloves 3 Keep the work place away from open flame hydrogen smoke 4 Check whether the polarity of two battery ends is grounded...

Страница 52: ...el 1 alarm OUT RMS Over CURR Level 1 alarm OUT Over FREQ Level 1 alarm OUT Low FREQ Level 1 alarm Inverse anomaly INV RMS Over VOLT Level 1 alarm INV RMS Low VOLT Level 1 alarm INV FAST Over CURR Leve...

Страница 53: ...ver Load Level 1 alarm BYPASS 125 Over Load Level 1 alarm BYPASS 150 Over Load Level 1 alarm BYPASS 200 Over Load Level 1 alarm FAN Fault Level 2 alarm METER or CT Inverse Level 2 alarm PV side fault...

Страница 54: ...alarm BMS alarm failure BATT Over VOLT Protect Level 2 alarm BATT Over CELL VOLT Protect Level 2 alarm BATT Low VOLT Protect Level 1 alarm BATT Low CELL VOLT Protect Level 1 alarm BATT CHG Over CURR...

Страница 55: ...1 alarm BATT LOW Capacity Alarm Level 1 alarm BATT Cell Unbalance Level 1 alarm BATT MOS Over TEMP Alarm Level 1 alarm BATT VOLT Measurement ERR Level 1 alarm BATT TEMP Measurement ERR Level 1 alarm B...

Страница 56: ...e inverter protection parameters start the inverter again after the power grid becomes normal 3 If the grid voltage or frequency is within the allowable range please contact the distributor or after s...

Страница 57: ...automatically returns to the normal operation status 2 If the alarm is repeated please contact the distributor or after sales service center INV Inductor Over CURR INV VOLT DC Component Over The DC cu...

Страница 58: ...the allowable upper limit of the inverter 1 Check whether the PV input voltage exceeds the allowable range of inverter protection parameters 2 After reduction of the bus voltage restart the inverter...

Страница 59: ...or PV2 is higher than the set upper limit 1 Check whether the PV input end is normal 2 Check whether the PV input configuration exceeds the allowable range of inverter protection parameters 3 If there...

Страница 60: ...too small 3 Restart the inverter If the failure persists please contact the distributor or after sales service center Buck Boost Over CURR Buck Boost current exceeds the set value 1 Check the output l...

Страница 61: ...service center BATT Over TEMP 1 The battery installation position is not ventilated 2 The ambient temperature is too high 1 Check whether the operating environment exceeds the operating temperature r...

Страница 62: ...00x1658 x305 600x1878 x305 Weight kg 93 143 193 243 293 343 Noise 25dB Cooling type Natural cooling Maximum altitude 4000m Operating temperature 20 58 Operating humidity 0 100 RH Non condensing Displa...

Страница 63: ...ed output frequency 50Hz 60Hz Rated output current 27 3A 26 1A Maximum output current 27 3A Power factor 0 99 0 8 lead 0 8 lag Total current harmonics 3 rated power AC output parameters Back up side R...

Страница 64: ...al cooling Maximum altitude 4000m Noise 25dB Installation method Floor stacking type Demission W H D mm 600 530 305 Weight kg 36 4 Lithium ion Battery Module Battery mode 5KWH General Cell technology...

Страница 65: ...s to one method for the energy storage inverter to reflect the depth of battery discharge Another method is SOC Equalized charging Refers to the constant current charging stage in which the charging v...

Страница 66: ...64...

Отзывы: