![East EAHI-6000-SL-S Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/east/eahi-6000-sl-s/eahi-6000-sl-s_manual_4350354025.webp)
~ 23 ~
5.2.2.2 Drilling
Tools: electric drills (drill size: φ6mm), hammers and expansion pipes and bolts (M6*50mm)
Drill the holes at the marked location by the
φ6mm electric drill.
Install the expansion tube into the holes by the
hammer.
5.2.2.3 Installation of base support
Tools: screwdrivers and screws(M4*8mm)
Before installation, take down the upper
and lower dust covers of the battery to
avoid damaging the equipment during
installation.
During installation, recommend to inversely
place the battery on a soft surface to avoid
scratching. Align the fool-proofing interface on
the base with the battery (do not remove the
waterproof connector jacket installed on the
base), and fasten the base onto the battery.
Содержание EAHI-6000-SL-S
Страница 66: ...64...