OP000470
3-9
Operation
Hydraulic System Warm-up
The correct operating temperature of the hydraulic oil is 50° -
80°C (120° - 175°F). Make sure to follow the procedures listed
here for hydraulic fluid warm-up.
1.
Run engine for approximately five minutes set at the middle
of the speed range, without a load.
2.
Set safety lever (1, Figure 13) on "UNLOCK" position.
3.
Slowly cycle boom, arm and bucket cylinders about five
times without a load to circulate the oil through the system.
Do this for five minutes.
4.
Check for clearance and fully raise the front attachment.
Swing clockwise 3 revolutions. Swing counterclockwise 3
revolutions.
5.
Travel forward and reverse at low speed for two revolutions
of the drive sprocket.
WARNING!
If a problem or abnormal operation occurs, immediately
shut down engine. Allow excavator to reach normal
operating temperature before starting work, especially in
cold weather.
FG007561
Figure 12
Lock
Unlock
FG007562
1
Figure 13
Figure 14
FG007563
Содержание DX35Z
Страница 2: ......
Страница 6: ...Table of Contents K1025196E IV Index 8 1 ...
Страница 60: ...OP000468 Safety 1 54 ...
Страница 64: ...OP000469 Operating Controls 2 4 OPERATOR S AREA FG007488 2 6 1 4 3 10 9 7 5 12 11 13 8 15 14 Figure 2 ...
Страница 66: ...OP000469 Operating Controls 2 6 OPERATIONAL CONTROLS AND PANELS 5 6 11 10 9 8 4 3 2 1 7 FG007489 Figure 3 ...
Страница 90: ...OP000469 Operating Controls 2 30 ...
Страница 132: ...OP000470 Operation 3 42 ...
Страница 176: ...OP000471 Inspection Maintenance and Adjustment 4 44 6 Roll the new O ring 1 into the O ring groove 1 FG007697 Figure 59 ...
Страница 204: ...OP000473 Specification 7 2 OVERALL DIMENSIONS A B D E F M K L G O N H I U T S R Q P J C 5 0 7 0 FG007625 Figure 1 ...