OP000470
3-25
Operation
11.
Make sure that there is adequate clearance from overhead
electrical supply lines. See Figure 58.
12.
If the excavation is in an underground location or in a
building, make sure that there is adequate overhead
clearance and that there is adequate ventilation. See
Figure 59.
13.
Do not use the bucket as a hammer or ramming device.
This is dangerous and causes damage to the front
attachment. See Figure 60.
14.
Do not dig with the excavator tracks raised. This can result
in structural and mechanical failures.
FG007594
Figure 58
FG007595
Figure 59
FG007596
Figure 60
FG007627
Figure 61
Содержание DX35Z
Страница 2: ......
Страница 6: ...Table of Contents K1025196E IV Index 8 1 ...
Страница 60: ...OP000468 Safety 1 54 ...
Страница 64: ...OP000469 Operating Controls 2 4 OPERATOR S AREA FG007488 2 6 1 4 3 10 9 7 5 12 11 13 8 15 14 Figure 2 ...
Страница 66: ...OP000469 Operating Controls 2 6 OPERATIONAL CONTROLS AND PANELS 5 6 11 10 9 8 4 3 2 1 7 FG007489 Figure 3 ...
Страница 90: ...OP000469 Operating Controls 2 30 ...
Страница 132: ...OP000470 Operation 3 42 ...
Страница 176: ...OP000471 Inspection Maintenance and Adjustment 4 44 6 Roll the new O ring 1 into the O ring groove 1 FG007697 Figure 59 ...
Страница 204: ...OP000473 Specification 7 2 OVERALL DIMENSIONS A B D E F M K L G O N H I U T S R Q P J C 5 0 7 0 FG007625 Figure 1 ...