OP000471
Inspection, Maintenance and Adjustment
4-20
50 HOUR / WEEKLY SERVICE
Perform All Daily Service Checks
Grease Front Attachment Pins
Grease every 10 hours for first 100 hours and every 50
hours thereafter.
NOTE:
If the unit has been running or working in water the
front attachment should be greased on a 10 hour /
daily basis.
•
Position machine as shown below and lower the
front attachment to the ground and shut down
engine
•
Press the grease fitting and inject grease with the
grease gun on the marked point
•
After injection, clean off the old grease that has
been purged.
Figure 28
Reference
Number
Description
A
Boom Cylinder (2 Points)
B
Arm Cylinder (2 Points)
C
Boom and Boom Swing Joint
(1 Points)
D
Boom and Arm Joint (1 Point)
E
Bucket Cylinder (2 Points)
F
Arm link Joint Pin (1 Point)
G
Arm and Bucket Joint (1 Point)
H
Link Joint (3 Point)
Reference
Number
Description
FG007675
C
B
B
A
A
D
H
E
G
F
E
Содержание DX35Z
Страница 2: ......
Страница 6: ...Table of Contents K1025196E IV Index 8 1 ...
Страница 60: ...OP000468 Safety 1 54 ...
Страница 64: ...OP000469 Operating Controls 2 4 OPERATOR S AREA FG007488 2 6 1 4 3 10 9 7 5 12 11 13 8 15 14 Figure 2 ...
Страница 66: ...OP000469 Operating Controls 2 6 OPERATIONAL CONTROLS AND PANELS 5 6 11 10 9 8 4 3 2 1 7 FG007489 Figure 3 ...
Страница 90: ...OP000469 Operating Controls 2 30 ...
Страница 132: ...OP000470 Operation 3 42 ...
Страница 176: ...OP000471 Inspection Maintenance and Adjustment 4 44 6 Roll the new O ring 1 into the O ring groove 1 FG007697 Figure 59 ...
Страница 204: ...OP000473 Specification 7 2 OVERALL DIMENSIONS A B D E F M K L G O N H I U T S R Q P J C 5 0 7 0 FG007625 Figure 1 ...