OP000471
4-37
Inspection, Maintenance and Adjustment
4,000 HOUR / BIENNIAL
SERVICE
Major Parts - Periodic Replacement
To ensure safe operation and work, perform periodic
inspections. Also, to increase safety, replace the following
parts. These parts are the ones most often subjected to
abrasion, heat and fatigue. Exchange these parts with new
ones at the designated time intervals, even if the old parts
look good.
Always replace all related parts such as gaskets and
O-rings. Use only original equipment manufacturers parts.
Major Component
Parts Name to be Exchanged Periodically
Time to Exchange
Engine
Fuel hose (Tank to filter).
2 years or 4,000
hours
Fuel hose (Tank to fuel injection pump).
Heater hose (Heater to engine).
Hydraulic
System
Body
Pump suction hose.
Pump discharge hose.
Swing hose.
Work
Device
Boom cylinder line hose.
Arm cylinder line hose.
Bucket cylinder line hose.
Pilot hose.
Boom swing cylinder line hose.
Содержание DX35Z
Страница 2: ......
Страница 6: ...Table of Contents K1025196E IV Index 8 1 ...
Страница 60: ...OP000468 Safety 1 54 ...
Страница 64: ...OP000469 Operating Controls 2 4 OPERATOR S AREA FG007488 2 6 1 4 3 10 9 7 5 12 11 13 8 15 14 Figure 2 ...
Страница 66: ...OP000469 Operating Controls 2 6 OPERATIONAL CONTROLS AND PANELS 5 6 11 10 9 8 4 3 2 1 7 FG007489 Figure 3 ...
Страница 90: ...OP000469 Operating Controls 2 30 ...
Страница 132: ...OP000470 Operation 3 42 ...
Страница 176: ...OP000471 Inspection Maintenance and Adjustment 4 44 6 Roll the new O ring 1 into the O ring groove 1 FG007697 Figure 59 ...
Страница 204: ...OP000473 Specification 7 2 OVERALL DIMENSIONS A B D E F M K L G O N H I U T S R Q P J C 5 0 7 0 FG007625 Figure 1 ...