BACnet MS/TP Communication Data Bus Fundamentals
Network Guide
25
Figure 8: Typical Cable-Shield Grounding Requirements for a BACnet MS/TP Data Bus Segment with a Building
Controller located in the Middle of the Data Bus
Figure 9: Typical Cable-Shield Grounding Requirements for a BACnet MS/TP Data Bus Segment without a
Building Controller
ECB-PTU Line-Powered Data Bus Controller Shield Grounding
Requirements
The shield on each data bus segment must be connected to the electrical system ground at
one point only, for example, at the Data Bus Master (Building Controller) if there is one, as
shown below in
and
. On data bus segments without a Data Bus Master,
the ideal point to ground the shield is in the middle of the data bus segment as shown in
Figure 10: Typical Cable-Shield Grounding Requirements for a BACnet MS/TP Data Bus Segment with a Building
Controller located in the End of the Data Bus
Typical BACnet 24VAC-
Powered Controller
Data Bus Shield:
Isolate with
electrical tape
Data Bus Shields: Twist
together and Isolate
with electrical tape
Typical BACnet 24VAC-
Powered Controller
Typical BACnet 24VAC-
Powered Controller
Data Bus: Shielded Twisted Pair Cable
NE
T+
NE
T
-
NE
T+
NE
T
-
NE
T+
NE
T
-
Bus Master (Building Controller)
Typical EC-BOS Device
+
-
S
Typical BACnet 24VAC-
Powered Controller
NE
T+
NE
T
-
Data Bus Shield:
Isolate with
electrical tape
Data Bus Shields:
Connect to the ‘S’
terminal
Electrical
System
Ground
The shield of the data bus must be connected to
the electrical system ground at one point only –
usually at the Building Controller , when present
Data Bus Shields: Twist
together and Isolate
with electrical tape
Typical BACnet 24VAC-
Powered Controller
Data Bus Shield:
Isolate with
electrical tape
Typical BACnet 24VAC-
Powered Controller
Data Bus Shields: Twist
together and Isolate
with electrical tape
Typical BACnet 24VAC-
Powered Controller
Data Bus Shields: Twist
together and Isolate
with electrical tape
Typical BACnet 24VAC-
Powered Controller
Data Bus: Shielded Twisted Pair Cable
NE
T+
NE
T
-
NE
T+
NE
T
-
NE
T+
NE
T
-
NE
T+
NE
T
-
Typical BACnet 24VAC-
Powered Controller
NE
T+
NE
T
-
Data Bus Shield:
Isolate with
electrical tape
Electrical
System
Ground
The shield of the data bus must be connected to
the electrical system ground at one point only,
ideally in the middle of the data bus as shown
Содержание ECB-VAV
Страница 1: ...User Guide Network Guide...
Страница 6: ...Table of Contents 4 Network Guide...
Страница 52: ...50 Network Guide...
Страница 70: ...68 Network Guide...
Страница 110: ...108 Network Guide...
Страница 121: ...LonWorks Troubleshooting Network Guide 119...
Страница 122: ...120 Network Guide...
Страница 124: ...122 Network Guide...
Страница 128: ...126 Network Guide...
Страница 134: ...132 Network Guide Figure 75 Example of How to Set a DIP Switch to 82 ON B A For example 82 A 1010 B 010...
Страница 136: ...134 Network Guide...
Страница 137: ...Network Guide...
Страница 138: ...Network Guide_UG_24_EN...