26
Maintenance instructions • DINO 160XT II • 180XT II • 210XT II
The green light in the control centre on the platform is lit, when the platform is within the
allowed operating range.
The reach limit switch
RK4
will stop the movements, which impair the stability of the lift
(extending the telescope and lowering the boom), at a predetermined position.
Adjusted values of the limits:
100 mm
w
W
RK4 - L
RK5 - L
160XT/XTB II
270 kg
1,925 mm 2,175 mm +0 / -50 mm
180XT/XTB II
215 kg
2,300 mm 2570 mm +0 / -50 mm
210XT/XTB II
80 kg
3,025 mm 3,525 mm +0 / -50 mm
The red warning light for overloading will illuminate as soon as the
RK4
has stopped the
movement. While at the outreach limit, the red warning light and the green signal light will
flash in turns. In this situation, the lift can be operated in the direction, in which it remains
inside the permitted outreach area.
The overload limit switch
RK5
backs up, if the
RK4
, for some reason, does not work.
Once the RK5 is activated, the red warning light for overloading in both control centres will
be continually illuminated, and a warning buzzer will sound on the platform.
The operation of the overload limit switches is based on monitoring of the boom's lifting
torque.
PRESSURE SPRING
LIFTING CYLINDER
ARTICULATED ARM
LIMIT SWITCHES RK4 and RK5
ADJUSTMENT
SCREWS
DANGER
WARNING
CAUTION
NOTICE
The limit switches must never be readjusted, nor the operation of the mechanism be
impeded.
Risk of turning over the lift!
Содержание DINO XT II 160
Страница 2: ......
Страница 6: ...6 Ekspluat cijas instrukcijas DINO 160XT II 180XT II 210XT II BLANK...
Страница 10: ...10 Operating instructions DINO 160XTB II 180XTB II 210XTB II 2 1 DIMENSION DRAWINGS 2 1 1 160 XTB II...
Страница 11: ...11 2 1 2 180 XTB II...
Страница 12: ...12 Operating instructions DINO 160XTB II 180XTB II 210XTB II 2 1 3 210 XTB II...
Страница 29: ...29 BLANK...
Страница 37: ...37 NOTES...
Страница 58: ...58 Operating instructions DINO 160XTB II 180XTB II 210XTB II NOTES...
Страница 59: ...59 NOTES...
Страница 63: ...63 7 2 LUBRICATION PLAN 6 9 7 11 7 8 1 5 5 3 2 12 3 4 10 13 14...
Страница 69: ...69 BLANK...
Страница 70: ...70 Operating instructions DINO 130T II BLANK...
Страница 72: ...72 Operating instructions DINO 130T II NOTES...
Страница 73: ...73 NOTES...