19
The initial inspection and test loading of the Dino aerial work platforms is performed by the
manufacturer. A protocol, drawn up during the inspection, will accompany the lift.
The protocols of the start-up and periodic inspections must be kept with the lift or its
immediate proximity for at least five years.
E. ELECTRIC APPLIANCES
G. SAFETY DEVICE
1. Electric appliances
1. Safety limit switch
2. Sound signal
F. CONTROL DEVICES
1. Protections
H. LOADING TEST
2. Symbols / directions
1.Dynamic = 237 kg
3. Placings
2. Static = 323 kg
4. Emergency stop
3. Work movements
FAILINGS AND NOTES
Failings have been repaired.
Date:
Signature:
Dinolift Oy
Raikkolantie 145
FIN-32210 LOIMAA, FINLAND
Tel. +358 - 20 - 1772 400, Fax +358 - 2 - 7627 160, e-mail: [email protected]
Содержание DINO XT II 160
Страница 2: ......
Страница 6: ...6 Ekspluat cijas instrukcijas DINO 160XT II 180XT II 210XT II BLANK...
Страница 10: ...10 Operating instructions DINO 160XTB II 180XTB II 210XTB II 2 1 DIMENSION DRAWINGS 2 1 1 160 XTB II...
Страница 11: ...11 2 1 2 180 XTB II...
Страница 12: ...12 Operating instructions DINO 160XTB II 180XTB II 210XTB II 2 1 3 210 XTB II...
Страница 29: ...29 BLANK...
Страница 37: ...37 NOTES...
Страница 58: ...58 Operating instructions DINO 160XTB II 180XTB II 210XTB II NOTES...
Страница 59: ...59 NOTES...
Страница 63: ...63 7 2 LUBRICATION PLAN 6 9 7 11 7 8 1 5 5 3 2 12 3 4 10 13 14...
Страница 69: ...69 BLANK...
Страница 70: ...70 Operating instructions DINO 130T II BLANK...
Страница 72: ...72 Operating instructions DINO 130T II NOTES...
Страница 73: ...73 NOTES...