
73
26.2.12
Check the anti-corrosive/paint coat
Check all the painted steel constructions, in particular the load-bearing structures
and welded seams for any damage in the paint coat. Grind off any rust and repaint
as necessary.
Check the box-type structures with anti-corrosion coating and renew the treatment if
necessary, using e.g. Tectyl 210R anti-corrosive agent.
26.2.13
Test run in accordance with the loading instructions
See the relevant test run instructions in point: Test loading instructions for regular
inspection
Check the structures after the test-run.
26.2.14
Draw up a protocol of the service
Save your own copy and give the other copy to the customer.
Содержание DINO 185XTS
Страница 2: ...2 ...
Страница 3: ...3 ORIGINAL OPERATING INSTRUCTIONS VALID FROM SERIAL NUMBER 540016 ...
Страница 8: ...8 2 REACH DIAGRAM ...
Страница 9: ...9 3 DIMENSION DRAWING ...
Страница 45: ...45 17 NOTES ...
Страница 49: ...49 Obscured greasing nipples 19 LUBRICATION INSTRUCTIONS ...
Страница 75: ...75 NOTES ...
Страница 77: ...77 28 1 1 Sample of inspection protocol for the access platform Continuous ...
Страница 78: ...78 ...
Страница 95: ...95 30 2 DINO 185 XTC ELECTRIC COMPONENTS 540003 30 3 ...
Страница 96: ...96 ...
Страница 97: ...97 ELECTRIC DIAGRAMS 540003 ...
Страница 98: ...98 ...
Страница 99: ...99 ...
Страница 100: ...100 ...
Страница 101: ...101 ...
Страница 102: ...102 ...
Страница 103: ...103 ...
Страница 104: ...104 ...
Страница 105: ...105 ...
Страница 106: ...106 ...
Страница 107: ...107 ...
Страница 108: ...108 ...
Страница 109: ...109 ...
Страница 110: ...110 ...
Страница 111: ...111 ...
Страница 112: ...112 ...
Страница 113: ...113 ...
Страница 114: ...114 ...
Страница 115: ...115 ...
Страница 116: ...116 ...
Страница 117: ...117 30 4 HYDRAULIC COMPONENTS 540016 ...
Страница 118: ...118 30 5 HYDRAULIC DIAGRAMS 540016 ...
Страница 119: ...119 ...
Страница 120: ...120 ...
Страница 121: ...121 31 NOTES ...