Assembling an UltraSCSI RAID Enclosure
B–10 UltraSCSI RAID Enclosure
Controller B Installation (Continued)
3. Insert the array controller into the slot and push it in until the
extractor latches engage the enclosure.
CXO5603A
4. Push in on the extractor latches to firmly seat the array controller.
5. Align controller “A” cache module with the cache module A slot in
the enclosure.
6. Insert the cache module into the slot and push it in until the extractor
latches engage the enclosure.
7. Push in on the extractor latches to firmly seat the cache module.
Internal Cables
All internal cables are cabinet–specific. The cabinet user documentation
describes the cable routing, location and function. The cables involved may
include:
•
Controller–to–controller
•
Controller-to–host
•
ECB–to–cache module cables
For a detailed description of the cable connection procedures and cable
routing refer to following publications:
•
The array controller documentation.
•
DIGITAL StorageWorks UltraSCSI RAID Cabinet Subsystem
(SW600-Series) Installation and User’s Guide.
Содержание StorageWorks UltraSCSI DS-BA370 Series
Страница 18: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...
Страница 54: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...
Страница 84: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...
Страница 120: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...
Страница 186: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...