SF3x Storage Enclosure FRU Replacement
5–19
5.1.5 Mounting the Disk ISE
Once testing completes successfully, mount the disk ISE and restore data
with BACKUP.
The SHOW CLUSTER command will continue to show the original name
of the replacement drive module. This will disappear only after the next
reboot.
NOTE
A moderate increase in error counts is to be expected after this
warm swap procedure has been correctly completed.
5.2 Replacing the Operator Control Panel
Use the following steps to remove and replace the OCP (PN 70–28887–01):
1. At the system console, dismount
all
the ISEs on that bus.
2. Take the disk ISEs in the storage enclosure off-line:
a. Press and release all Ready buttons on the OCP. Wait for the
Ready LEDs to go out.
b. At the front of the storage enclosure, set the drive dc power
switches to
off
. The switch element LEDs should go out to indicate
that power has been removed from the disk ISE. If any LED does
not go out, suspect a faulty switch.
CAUTION
Wear an ESD grounding strap at all times while handling the
storage enclosure or any of its FRUs.
3. Remove the OCP—grasp it firmly and pull it straight out. Do not pry;
the panel comes free with a straight pull.
CAUTION
Do not bend the alignment or connector pins when reinstalling
the OCP. The panel should go into place without force.
4. Align the replacement OCP connector pins with the clip fasteners on
the transition module and push straight in to lock the fasteners.
5. Push the OCP into the fasteners by applying equal pressure to both
sides.
6. Restore the enclosure to service, and run the checkout procedure in
Section 5.9.2.
Содержание EK-SFXXS-SG-003
Страница 1: ...DECarray Service Guide EK SFXXS SG 003 Digital Equipment Corporation ...
Страница 10: ......
Страница 18: ...1 8 Introduction Figure 1 3 SF7x Series Storage Enclosure SHR_X1123C_89 ...
Страница 24: ......
Страница 44: ......
Страница 56: ......
Страница 59: ...DECarray FRU Removal and Replacement 4 3 Figure 4 1 Removing DECarray Door DOOR HINGE S H R X 0 0 1 2 9 1 ...
Страница 168: ...6 60 SF7x Storage Enclosure FRU Replacement Figure 6 18 Enclosure Internal DSSI Cables ...
Страница 169: ...SF7x Storage Enclosure FRU Replacement 6 61 Figure 6 19 Enclosure Internal DSSI Cables cont ...
Страница 170: ...6 62 SF7x Storage Enclosure FRU Replacement Figure 6 20 Enclosure Internal DSSI Cables cont ...
Страница 176: ......
Страница 180: ......
Страница 220: ......
Страница 224: ......