![Datex-Ohmeda Aestiva 7900 SmartVent Скачать руководство пользователя страница 157](http://html.mh-extra.com/html/datex-ohmeda/aestiva-7900-smartvent/aestiva-7900-smartvent_technical-reference-manual_513817157.webp)
6 Maintenance
1006-0453-000 05/04
6-7
6. Occlude the top of the standpipe tube with your finger, making sure the
tube remains 1/2 inch (15mm) above the blue seal.
7. Check the manifold pressure reading on the service screen. The MOPV
valve is functioning correctly if the steady state pressure reading is
<120cm H
2
O.
8. Set the system switch to Standby.
9. Remove the test plug from the exhalation valve port.
10. Remove the standpipe from the port and reinstall in the exhalation valve.
11. Reassemble the breathing system.
12. Perform the Preoperative Checkout Procedure in the Aestiva Operation
Manual.
Содержание Aestiva 7900 SmartVent
Страница 1: ...Aestiva 5 7900 Anesthesia Ventilator Technical Reference Manual ...
Страница 44: ...Notes 2 28 05 04 1006 0453 000 ...
Страница 81: ...4a Tests and Calibration 4 X Software 1006 0453 000 05 04 4a 35 Figure 4 38 Service Calibration full menu ...
Страница 82: ...Notes 4a 36 05 04 1006 0453 000 ...
Страница 116: ...Notes 4b 34 05 04 1006 0453 000 ...
Страница 150: ...Notes 5 34 05 04 1006 0453 000 ...
Страница 158: ...Notes 6 8 05 04 1006 0453 000 ...
Страница 182: ...Notes 7 24 05 04 1006 0453 000 ...
Страница 189: ...8 Illustrated Parts 1006 0453 000 05 04 8 7 U14 U23 4 12 13 14 15 16 15 18 21 20 23 24 1 1a 22 17 19 ...
Страница 202: ...Notes 8 20 05 04 1006 0453 000 ...
Страница 203: ......