![background image](http://html1.mh-extra.com/html/danfoss/isave-40/isave-40_operation-manual_3540938081.webp)
Operation guide | iSave 40
81
180R9239 | AQ299555093252en-001601 | iSave 40 | 09.2022
1.
Assemble the O-ring on the LP in port
flange.
2.
Position the guide pin into the casing.
8.
Assembling the
pressure exchanger
WARNING:
Do not use silicone when assembling the
iSave. Do not reuse disassembled O-rings;
they might be damaged. Always use new
O-rings.
Important:
It is essential that the pump is serviced in
conditions of absolute cleanliness. All parts
must be absolutely clean before mounting.
Lubrication:
•
To prevent cold welding, Danfoss reco
mend to use thread lubricant for all screw
threads for installing the iSave
and first tighten the screws by hand.
•
It is important to lubricate ALL parts to be
assembled with clean filtered water
(Especially all PEEK parts).
Assembling cylinder barrel in pressure
exchanger, see page 23.
Follow step 1-3 if LP in flange has been dis-
assembled from casing.
3.
Position the LP in flange on the guide pin
and assemble all the bolts into the casing
Tighten the bolts to the torque specified
in the exploded view.
4.
Turn the assembly and position the two
guide pins in the flange inside the casing.
M8x20 bolts marked A4
Содержание iSave 40
Страница 34: ...Operation guide iSave 40 34 180R9239 AQ299555093252en 001601 iSave 40 09 2022 iSave 40 Code no 180F7011...
Страница 53: ...Operating guide Energy recovery device iSave 40 Appendices hpp danfoss com...
Страница 96: ...M a n u a l Electric Motors Motor Manual hoyermotors com...
Страница 100: ...101 180R9379 AQ188686503004en 000801 PAH 2 12 5 07 2022...