AK-CH
650
Capacity
controller RS8ER302 © Danfoss 2016-02
43
The connections for the example can be seen
here.
Mounting and wiring - continued
Fr
equenc
y c
on
ver
ter
VSD c
ompr
essorspeed
Consumption limit
Room F
an
Fr
ost pr
ot
ec
tion
Rec
eiv
er lev
el alar
m
Liquid injec
tion in
hea
t e
xchanger
Pumpe flo
w swit
ch
1
2
3
The screen on the pressure transmitter
cables must only be connected at the
end of the controller.
Comp
. 1 G
en. saf
et
y
Comp
. 2 G
en. saf
et
y
Comp
. 3 G
en. saf
et
y
Comp
. 4 G
en. saf
et
y
Warning
Keep signal cables separate from
cables with high voltage.
2. Connect LON communication network
The installation of the data communication must comply with
the requirements set out in document RC8AC.
3. Connect supply voltage
Is 24 V, and the supply must not be used by other controllers or
devices. The terminals must not be earthed.
4. Follow light-emitting diodes
When the supply voltage is connected the controller will go
through an internal check. The controller will be ready in just
under one minute when the light-emitting diode ”Status” starts
flashing slowly.
5. When there is a network
Set the address and activate the Service Pin.
6. The controller is now ready to be configured.
■
Power
■
Comm
■
DO1
■
Status
■
DO2
■
Service Tool
■
DO3
■
LON
■
DO4
■
DO5
■
Alarm
■
DO6
■
DO7
■
DO8
■
Service Pin
Internal communication
between the modules:
Quick flash = error
Constantly On = error
Status on output 1-8
Slow flash = OK
Quick flash = answer from gateway
in 10 min. after network
installation
Constantly ON = error
Constantly OFF = error
Flash = active alarm/not cancelled
Constant ON = Active alarm/cancelled
External communication
Network installation