17
|
Piping installation
Installer and user reference guide
83
R R8T7V1B
VRV IV heat pump for indoor installation
4P499898-1A – 2020.10
a b c d
a
Cut the insulation (under the knockout hole).
b
Hit on the knockout hole, and remove it.
c
Remove the burrs.
d
Paint the edges and areas around the edges using repair paint to prevent rusting.
NOTICE
Precautions when making knockout holes:
▪
Avoid damaging the casing.
▪
After making the knockout holes, we recommend you remove the burrs and paint
the edges and areas around the edges using repair paint to prevent rusting.
▪
When passing electrical wiring through the knockout holes, wrap the wiring with
protective tape to prevent damage.
4
Connect piping (by brazing) as follows:
8 HP
5 HP
c
d
d
c
b
a
b
a
3 1
2
3
2
1
a
Liquid line (circuit 1: to heat exchanger unit)
b
Gas line (circuit 1: to heat exchanger unit)
c
Liquid line (circuit 2: to indoor units)
d
Gas line (circuit 2: to indoor units)
1
Pinched piping
2
Piping accessory
3
Field piping
5
Reattach the service cover.
6
Seal all gaps (example: a) to prevent small animals from entering the system.
Содержание VRV IV RKXYQ5T8Y1B Series
Страница 155: ......
Страница 156: ...4P499898 1A 2020 10 Copyright 2017 Daikin Verantwortung f r Energie und Umwelt...