16
|
Unit installation
Installer and user reference guide
71
R R8T7V1B
VRV IV heat pump for indoor installation
4P499898-1A – 2020.10
3
Wind the sealing pad (= insulation) around the metal clamp and drain hose,
and fix it with cable ties.
4
Connect the drain piping to the drain hose.
≤
4 mm
A
A'
A-A'
A
A'
e
c
d
b
a
d
c
a
b
2+3+4
1
a
Drain pipe connection (attached to the unit)
b
Drain hose (accessory)
c
Metal clamp (accessory)
d
Sealing pad (accessory)
e
Drain piping (field supply)
Guidelines when installing a drain pump and drain reservoir
If you install a drain pump, you must also install a drain reservoir. The drain pump
and drain reservoir are to be field supplied.
▪
Drain pump:
-
Minimum flow rate:
45 l/h
-
Feedback contact.
You can connect a contact that gives the status of the drain
pump to the heat exchanger unit. The heat pump uses this contact as an input.
A1P
X1M
X2M
1
2
X2M
X2M
b
a
X2M
d
X2M
c
a
Feedback contact from the drain pump
b
Cable tie
c
Drain pump malfunction: If the contact opens, the heat pump stops operating and
gives an error. For more information, see
d
Drain pump normal operation: If the contact closes, the heat pump resumes normal
operation.
▪
Drain reservoir:
-
Minimum volume:
3 l
-
Best practice:
Use a drain reservoir with a float switch that gives an ON/OFF
signal to the drain pump.
To check for water leaks
Gradually put approximately 1 l of water in the drain pan, and check for water
leaks.
Содержание VRV IV RKXYQ5T8Y1B Series
Страница 155: ......
Страница 156: ...4P499898 1A 2020 10 Copyright 2017 Daikin Verantwortung f r Energie und Umwelt...