17
|
Piping installation
Installer and user reference guide
72
R R8T7V1B
VRV IV heat pump for indoor installation
4P499898-1A – 2020.10
17 Piping installation
In this chapter
17.1 Preparing refrigerant piping
17.1.1 Refrigerant piping requirements
INFORMATION
Also read the precautions and requirements in the
NOTICE
The refrigerant R410A requires strict cautions for keeping the system clean, dry and
tight.
▪
Clean and dry: foreign materials (including mineral oils or moisture) should be
prevented from getting mixed into the system.
▪
Tight: R410A does not contain any chlorine, does not destroy the ozone layer,
and does not reduce earth's protection against harmful ultraviolet radiation.
R410A can contribute to the greenhouse effect if it is released. Therefore pay
special attention to check the tightness of the installation.
NOTICE
The piping and other pressure-containing parts shall be suitable for refrigerant. Use
phosphoric acid deoxidised seamless copper for refrigerant.
Содержание VRV IV RKXYQ5T8Y1B Series
Страница 155: ......
Страница 156: ...4P499898 1A 2020 10 Copyright 2017 Daikin Verantwortung f r Energie und Umwelt...