16
|
Unit installation
Installer and user reference guide
70
R R8T7V1B
VRV IV heat pump for indoor installation
4P499898-1A – 2020.10
16.4.4 Guidelines when installing the drain piping
Make sure condensation water can be evacuated properly. This involves:
▪
General guidelines
▪
Connecting the drain piping to the heat exchanger unit
▪
Installing a drain pump and drain reservoir
▪
Checking for water leaks
General guidelines
▪
Pipe length.
Keep drain piping as short as possible.
▪
Pipe size.
Keep the pipe size equal to or greater than that of the connecting pipe
(vinyl pipe of 25 mm nominal diameter and 32 mm outer diameter).
▪
Slope.
Make sure the drain piping slopes down (at least 1/100) to prevent air
from being trapped in the piping. Use hanging bars as shown.
1~1.5 m
a
a
Hanging bar
O
Allowed
X
Not allowed
▪
Condensation.
Take measures against condensation. Insulate the complete drain
piping in the building.
▪
Bad odours.
To prevent bad odours and air going into the unit through the drain
piping, install a trap.
a
a
Trap
▪
Combining drain pipes.
You can combine drain pipes. Make sure to use drain
pipes and T-joints with a correct gauge for the operating capacity of the units.
≥100 mm
a
b
c
b
a
Heat exchanger unit
b
Indoor unit
c
T-joint
To connect the drain piping to the heat exchanger unit
NOTICE
Incorrect connection of the drain hose might cause leaks, and damage the
installation space and surroundings.
1
Push the drain hose as far as possible over the drain pipe connection.
2
Tighten the metal clamp until the screw head is less than 4 mm from the
metal clamp part.
Содержание VRV IV RKXYQ5T8Y1B Series
Страница 155: ......
Страница 156: ...4P499898 1A 2020 10 Copyright 2017 Daikin Verantwortung f r Energie und Umwelt...