
17
|
Piping installation
Installer and user reference guide
80
R R8T7V1B
VRV IV heat pump for indoor installation
4P499898-1A – 2020.10
To close the stop valve
1
Remove the stop valve cover.
2
Insert a hexagon wrench into the stop valve and turn the stop valve clockwise.
3
When the stop valve cannot be turned any further, stop turning.
4
Install the stop valve cover.
Result:
The valve is now closed.
To handle the stop valve cover
▪
The stop valve cover is sealed where indicated by the arrow. Do NOT damage it.
▪
After handling the stop valve, tighten the stop valve cover securely, and check for
refrigerant leaks. For the tightening torque, refer to the table below.
To handle the service port
▪
Always use a charge hose equipped with a valve depressor pin, since the service
port is a Schrader type valve.
▪
After handling the service port, make sure to tighten the service port cover
securely. For the tightening torque, refer to the table below.
▪
Check for refrigerant leaks after tightening the service port cover.
Tightening torques
Stop valve size
(mm)
Tightening torque N•m (turn clockwise to close)
Shaft
Valve body
Hexagonal
wrench
Cap (valve lid)
Service port
Ø9.5
5.4~6.6
4 mm
13.5~16.5
11.5~13.9
Ø12.7
8.1~9.9
18.0~22.0
Ø19.1
27.0~33.0
8 mm
22.5~27.5
Содержание VRV IV RKXYQ5T8Y1B Series
Страница 155: ......
Страница 156: ...4P499898 1A 2020 10 Copyright 2017 Daikin Verantwortung f r Energie und Umwelt...