background image

STP / IST Fixed & Variable Length

Installation and Owner’s Manual

©2009 400604005 Rev. 15

Franklin Fueling Systems

 • 3760 Marsh Rd. • Madison, WI 53718 USA

Tel:  +1 608 838 8786 • 800 225 9787 • Fax: +1 608 838 6433 • www.franklinfueling.com

Содержание STP

Страница 1: ...ixed Variable Length Installation and Owner s Manual 2009 400604005 Rev 15 Franklin Fueling Systems 3760 Marsh Rd Madison WI 53718 USA Tel 1 608 838 8786 800 225 9787 Fax 1 608 838 6433 www franklinfu...

Страница 2: ...toring equipment is often housed in containment sumps designed to trap hazardous liquid spills and prevent contamination of the environment and as a consequence containment sumps can trap dangerous am...

Страница 3: ...e PEI RP100 Latest Edition Recommended Practices for Installation of Aboveground Storage Systems for Motor Vehicle Fueling The Petroleum Equipment Institute PEI RP200 Latest Edition Installation of Un...

Страница 4: ...the discharge casting Improper alignment could damage the wire lead or motor pins Failure to push PMA up snug against the discharge casting before tightening cap screws or failure to use a cross patte...

Страница 5: ...ser thread engagement 1 6 Length bottom of riser to end bell 90 Figure 5 Measure Tank 16 Hold the manifold securely to the surface to prevent damage while setting length To allow movement of the teles...

Страница 6: ...rdware pack p n 400301903 as shown in figure 10 Figure 10 Wire Through Contractor s Plug 22 Using the screwdriver slide the contractors plug into its seat in the discharge manifold Tighten the two scr...

Страница 7: ...the loosening direction during the tightening process may scrape away the thread sealing compound making it impossible to perform a tank tightness test This may also create a potential site for fuel...

Страница 8: ...t be filled with wires or a celcon rod to enable it to seal 36 Replace the junction box cover and tighten securely The pump discharge manifold has two labeled ports one for the syphon system and one f...

Страница 9: ...60 Hz capacitor Use a 40 F 370 V single phase 60 Hz capacitor Use a 15 F 440 V single phase 50 Hz capacitor Use a 40 F 440 V single phase 50 Hz capacitor 190 V 70 Hz 3 ph power to variable speed unit...

Страница 10: ...ssure relief valve in the check valve so it does not relieve line pressure back to the tank Syphon Systems Optional Syphoned tanks should be of the same diameter with tank bottoms located on the same...

Страница 11: ...11 Wiring Diagram 1...

Страница 12: ...e For further wiring diagrams see installation and owners manuals that came with pump controller Wiring must conform to all federal state and local electrical codes Contact FE Petro Technical Support...

Страница 13: ...g 17 400600002 5 16 24 x 7 16 Set Screw for VL units only 3 18 400333015 O Ring Motor Discharge 1 19 400264009 5 16 18 x 1 1 8 Socket Head Cap Screw 4 20 400263004 5 16 High collar Lock Washer may pur...

Страница 14: ...0280001 3 8 Standard Flat washer may purchase locally 2 10 400651930 Junction Box Assembly includes two of each Item 7 8 9 1 11 400210212 O Ring 2 Item Part Description Qty 13 400200930 Wire Connector...

Страница 15: ...1 Bracket Power Switch 1 3 400158901 Light Assembly 120V CBS 1 400158902 Light Assembly 240V CBBS 1 4 400215931 Relay 30A 120V 1 400215933 Relay 30A 240V 1 5 400278005 Terminal Strip 1 6 402410001 Lab...

Страница 16: ...est port NPT Vapor Recovery Discharge Port 1 NPT Riser Column Pipe Centerline Riser Column Pipe Centerline 11 70 7 55 R 10 45 8 12 R 3 00 5 80 3 63 Leak Detector Port 2 NPT Discharge Outlet 2 NPT 12 5...

Отзывы: