Field Setting
Si71-812
88
Field Setting
1.1.3 Next, Run the Humidifier
<VKM-GAMV1 series only>
1. Check that the water supply piping is connected securely.
2. Open the water supply shut-off valve. (No water will be supplied at this time.)
3. Run the HRV unit in heating mode.
(See the operating manual included with the indoor unit for details on how to run the unit in
heating mode.)
The water supply will start and the humidifier will begin operation.
4. After starting heating (humidifying), the sound of the water supply solenoid valve will be
heard every 3 or 4 minutes (a clicking sound), so listening for that clicking sound let the unit
run for 30 minutes to make sure that humidifying operation is normal.
CAUTION
If carpentry work is not completed when a test run is finished, tell the customer not to run the
humidifier for the protection of indoor unit and HRV until it is completed.
If the humidifier is run, paint, particles generated from adhesive and other materials used for
carpentry work may cause HRV to get dirty, causing splash or leakage of water.
C : 3P130768-2E
Содержание VKM100GAMV1
Страница 9: ...Introduction Si71 812 viii ...
Страница 10: ...Si71 812 General Constructions 1 Part 1 General Constructions 1 General Information 2 1 1 Features 2 ...
Страница 43: ...Operation Si71 812 34 Operation ...
Страница 53: ...Inspection and Maintenance of the Humidifier Si71 812 44 Maintenance ...
Страница 91: ...Troubleshooting Si71 812 82 Troubleshooting ...
Страница 92: ...Si71 812 Field Setting 83 Part 7 Field Setting 1 Field Setting 84 1 1 Field Setting and Test Run 84 ...
Страница 99: ...Appendix Si71 812 90 Appendix 1 Appendix 1 1 Wiring Diagram VKM50GAMV1 VKM80GAMV1 VKM100GAMV1 ...
Страница 100: ...Si71 812 Appendix Appendix 91 VKM50GAV1 VKM80GAV1 VKM100GAV1 ...
Страница 103: ...Piping Diagram Si71 812 94 Appendix ...
Страница 105: ...Si71 812 ii Index ...