Pump Down Operation
SiUS042113E
148
Part 7 Trial Operation and Field Settings
Reference
1. Pump Down Operation
Outline
In order to protect the environment, be sure to conduct pump down operation when relocating or
disposing of the unit.
Details
1. Remove the valve caps from the liquid stop valve and the gas stop valve.
2. Carry out forced cooling operation.
3. After 5 to 10 minutes, close the liquid stop valve with a hexagonal wrench.
4. After 2 to 3 minutes, close the gas stop valve and stop the forced cooling operation.
Refer to Forced Cooling Operation on page 149 for details.
Gas stop valve
Valve cap
Close
Liquid stop valve
Service port
(R25008)
Hexagonal
wrench
Содержание FTXM-V Series
Страница 13: ...SiUS042113E Part 1 General Information 9 1 Applicable Models 10 2 Functions 11 Part 1 General Information...
Страница 16: ...SiUS042113E 12 Part 2 Specifications 1 Specifications 13 Part 2 Specifications...
Страница 96: ...Troubleshooting SiUS042113E 92 Part 6 Service Diagnosis Reference Check No 01 Refer to P 134...
Страница 147: ...SiUS042113E Check Part 6 Service Diagnosis 143 09 12 class 18 24 class 1 2 3 4 Multimeter R24538 1 2 3 4 Multimeter...
Страница 150: ...Check SiUS042113E 146 Part 6 Service Diagnosis 18 24 class R24539 DC DC W V U...
Страница 165: ...SiUS042113E Piping Diagrams Part 8 Appendix 161 1 2 Outdoor Unit RXM09 12VVJU RXM18VVJU 3D131979 3D132216...
Страница 166: ...Piping Diagrams SiUS042113E 162 Part 8 Appendix RXM24VVJU 3D132217...
Страница 171: ...SiUS042113E Operation Limit Part 8 Appendix 167 3 Operation Limit RXM09 12 18 24VVJU 3D133582A...