Outdoor Unit
SiENBE04-507A
190
Removal Procedure
2.2
Removal of Electrical Box
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
Remove the top panel.
Disconnect the connector
for fan motor.
1. Remove the electrical
box.
1
Disconnect the 2
reactor harnesses.
2
Disconnect the relay
connector for
compressor lead wire.
3
Disconnect the
connector for four way
valve (S80).
When reassembling, coil the
excessive lead wire and
hang the loop on the hook.
S80
Содержание FTKS20DVMW(L)
Страница 10: ...SiENBE04 507A List of Functions 1 Part 1 List of Functions 1 List of Functions 2...
Страница 16: ...SiENBE04 507A Specifications 7 Part 2 Specifications 1 Specifications 8 1 1 Cooling Only 8 1 2 Heat Pump 21...
Страница 53: ...Printed Circuit Board Connector Wiring Diagram SiENBE04 507A 44 Printed Circuit Board Connector Wiring Diagram...
Страница 85: ...Control Specification SiENBE04 507A 76 Function and Control...
Страница 159: ...Check SiENBE04 507A 150 Service Diagnosis...
Страница 198: ...SiENBE04 507A Outdoor Unit Removal Procedure 189 When reassembling make sure to fit the hook Step Procedure Points Hook...
Страница 212: ...SiENBE04 507A Others 203 Part 8 Others 1 Others 204 1 1 Test Run from the Remote Controller 204 1 2 Jumper Settings 205...
Страница 215: ...Others SiENBE04 507A 206 Others...
Страница 221: ...Wiring Diagrams SiENBE04 507A 212 Appendix...
Страница 225: ...SiENBE04 507A iv Index...