SiENBE04-507A
Indoor Unit
Removal Procedure
165
1.6
Removal of PCB
Procedure
Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Removing the shelter
1
2
3
The figure shows the
appearance of the
electrical box.
Open the shelter (at the
back).
Push the upper centre
of the shelter and
unfasten the hooks at
the upper 2 positions of
the shelter.
Preparation
Remove the electrical box
according to the “Removal
of Electrical Box.”
2. Removing the heat
exchanger thermistor
1
Remove the heat
exchanger thermistor
and disconnect the
earth wire.
Earth wire
Clamp
Heat exchanger
thermistor
Signal receiver
PCB
Signal receiver unit
Shelter (back)
Hooks
Hook
Hook
Содержание FTKS20DVMW(L)
Страница 10: ...SiENBE04 507A List of Functions 1 Part 1 List of Functions 1 List of Functions 2...
Страница 16: ...SiENBE04 507A Specifications 7 Part 2 Specifications 1 Specifications 8 1 1 Cooling Only 8 1 2 Heat Pump 21...
Страница 53: ...Printed Circuit Board Connector Wiring Diagram SiENBE04 507A 44 Printed Circuit Board Connector Wiring Diagram...
Страница 85: ...Control Specification SiENBE04 507A 76 Function and Control...
Страница 159: ...Check SiENBE04 507A 150 Service Diagnosis...
Страница 198: ...SiENBE04 507A Outdoor Unit Removal Procedure 189 When reassembling make sure to fit the hook Step Procedure Points Hook...
Страница 212: ...SiENBE04 507A Others 203 Part 8 Others 1 Others 204 1 1 Test Run from the Remote Controller 204 1 2 Jumper Settings 205...
Страница 215: ...Others SiENBE04 507A 206 Others...
Страница 221: ...Wiring Diagrams SiENBE04 507A 212 Appendix...
Страница 225: ...SiENBE04 507A iv Index...