ESIE05-04
Disassembly and Maintenance
Part 5 – Disassembly and Maintenance
5–53
3
5
1
5
1.12.6 Removal of Switch Box
Warning
Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step
Procedure
Points
Remove decoration panel
first.
1
Remove the lid of switch
box.
(Two pieces of M4
screws)
2
Disconnect the
connection wires for
outdoor units and earth
wire. At this time, cut the
tie wrap fixing the
connection wires.
Disconnect wire of
remote controller also. At
this time, cut the tie wrap
fixing the wire of remote
controller.
(S2650)
(S2651)
Fixing
screw
(M4×12)
Fixing
screw
(M5×12)
Fixing screw
(M4×12)
Wires for remote controller
Tie wrap
Tie wrap
Outdoor unit
connection wire
and earth wire
Outdoor unit
connection
wire terminal
P1 P2 F1 F2
X17A
X18A
X25A
X20A
Capacitor
for fan
X15A
Содержание FHQ100BUV3B
Страница 1: ...Service Manual ESIE05 04 R 410A Sky Air Indoor...
Страница 2: ......
Страница 20: ...ESIE05 04 1 2 Part 1 System Outline 3 1 1 5...
Страница 62: ...General Outline ESIE05 04 1 44 Part 1 System Outline 3 1 1 4 5...
Страница 78: ...ESIE05 04 1 60 Part 1 System Outline...
Страница 112: ...Wiring Diagrams ESIE05 04 1 94 Part 1 System Outline 3 1 1 4 5...
Страница 140: ...ESIE05 04 2 2 Part 2 Functional Description 3 1 2 5...
Страница 164: ...ESIE05 04 3 2 Part 3 Troubleshooting 3 1 3 5...
Страница 206: ...Error Codes ESIE05 04 3 44 Part 3 Troubleshooting 3 1 3 4 5...
Страница 224: ...Additional Checks for Troubleshooting ESIE05 04 3 62 Part 3 Troubleshooting 3 1 3 4 5...
Страница 226: ...ESIE05 04 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 252: ...ESIE05 04 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Страница 384: ...Disassembly and Maintenance ESIE05 04 5 134 Part 5 Disassembly and Maintenance 3 1 5 5...
Страница 390: ...ESIE05 04 vi Index 3 1 4 5 W Wiring diagrams Indoor units k 1 61...