ESIE05-04
Disassembly and Maintenance
Part 5 – Disassembly and Maintenance
5–67
3
5
1
5
4
Remove the heat
exchanger.
2
Installing the heat
exchanger
1
Insert the heat exchanger
in the groove of ceiling
polystyrene foam
properly, and bring the
tube plate section of heat
exchanger into intimate
contact with the
polystyrene partition
plate correctly.
2
Insert the claw section of
pipe fixing plate into the
contracted part of the
external plate securely.
Step
Procedure
Points
(S2677)
Groove of ceiling polystyrene foam.
Polystyrene partition plate
for heat exchanger tube plate
(S2678)
Bring the heat exchanger
tube plate section into intimate
contact with polystyrene partition
plate without clearance.
(S2680)
(S2679)
Claw section
Содержание FHQ100BUV3B
Страница 1: ...Service Manual ESIE05 04 R 410A Sky Air Indoor...
Страница 2: ......
Страница 20: ...ESIE05 04 1 2 Part 1 System Outline 3 1 1 5...
Страница 62: ...General Outline ESIE05 04 1 44 Part 1 System Outline 3 1 1 4 5...
Страница 78: ...ESIE05 04 1 60 Part 1 System Outline...
Страница 112: ...Wiring Diagrams ESIE05 04 1 94 Part 1 System Outline 3 1 1 4 5...
Страница 140: ...ESIE05 04 2 2 Part 2 Functional Description 3 1 2 5...
Страница 164: ...ESIE05 04 3 2 Part 3 Troubleshooting 3 1 3 5...
Страница 206: ...Error Codes ESIE05 04 3 44 Part 3 Troubleshooting 3 1 3 4 5...
Страница 224: ...Additional Checks for Troubleshooting ESIE05 04 3 62 Part 3 Troubleshooting 3 1 3 4 5...
Страница 226: ...ESIE05 04 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 252: ...ESIE05 04 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Страница 384: ...Disassembly and Maintenance ESIE05 04 5 134 Part 5 Disassembly and Maintenance 3 1 5 5...
Страница 390: ...ESIE05 04 vi Index 3 1 4 5 W Wiring diagrams Indoor units k 1 61...