ESIE05-04
Disassembly and Maintenance
Part 5 – Disassembly and Maintenance
5–49
3
5
1
5
1.12.4 Removal of Horizontal Vane
Warning
Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step
Procedure
Points
1
Removing the decoration
panel
Q
Refer to the "Removal
of Decoration Panel"
2
Remove the padding at
four corners of frame
fixed with three screws
each. At that time, peel
the end of black sealing
material of discharge port
in part.
Q
Peel not the anti-sweat
material but only sealing
material of discharge port.
Note: When restore the
sealing material of
discharge port, be careful
that no clearance exists
between padding and
sealing material as
original installation.
(Otherwise, due dripping
may occur due to leakage
of cool air.)
(S2642)
(S2643)
Anti-sweat material
Sealing material
of discharge port
(S2644)
Padding
Sealing material
of discharge port
Anti-sweat material
Содержание FHQ100BUV3B
Страница 1: ...Service Manual ESIE05 04 R 410A Sky Air Indoor...
Страница 2: ......
Страница 20: ...ESIE05 04 1 2 Part 1 System Outline 3 1 1 5...
Страница 62: ...General Outline ESIE05 04 1 44 Part 1 System Outline 3 1 1 4 5...
Страница 78: ...ESIE05 04 1 60 Part 1 System Outline...
Страница 112: ...Wiring Diagrams ESIE05 04 1 94 Part 1 System Outline 3 1 1 4 5...
Страница 140: ...ESIE05 04 2 2 Part 2 Functional Description 3 1 2 5...
Страница 164: ...ESIE05 04 3 2 Part 3 Troubleshooting 3 1 3 5...
Страница 206: ...Error Codes ESIE05 04 3 44 Part 3 Troubleshooting 3 1 3 4 5...
Страница 224: ...Additional Checks for Troubleshooting ESIE05 04 3 62 Part 3 Troubleshooting 3 1 3 4 5...
Страница 226: ...ESIE05 04 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 252: ...ESIE05 04 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Страница 384: ...Disassembly and Maintenance ESIE05 04 5 134 Part 5 Disassembly and Maintenance 3 1 5 5...
Страница 390: ...ESIE05 04 vi Index 3 1 4 5 W Wiring diagrams Indoor units k 1 61...