
ESIE05-04
Additional Checks for Troubleshooting
Part 3 – Troubleshooting
3–61
3
3
4
5
1
4.8.2
Indoor Unit: Fan Motor Checks (Phase Controlled Motor)
(1) Turn the power supply off.
With the relay connector disconnected, measure the resistance between UVW phases of the
connector (3 cores) at the motor side, then make sure that the resistance between each phase is
balanced and not short-circuited.
Red
White
Black
U
V
W
Measure the resistance between
each phase.
(S2675)
Содержание FHQ100BUV3B
Страница 1: ...Service Manual ESIE05 04 R 410A Sky Air Indoor...
Страница 2: ......
Страница 20: ...ESIE05 04 1 2 Part 1 System Outline 3 1 1 5...
Страница 62: ...General Outline ESIE05 04 1 44 Part 1 System Outline 3 1 1 4 5...
Страница 78: ...ESIE05 04 1 60 Part 1 System Outline...
Страница 112: ...Wiring Diagrams ESIE05 04 1 94 Part 1 System Outline 3 1 1 4 5...
Страница 140: ...ESIE05 04 2 2 Part 2 Functional Description 3 1 2 5...
Страница 164: ...ESIE05 04 3 2 Part 3 Troubleshooting 3 1 3 5...
Страница 206: ...Error Codes ESIE05 04 3 44 Part 3 Troubleshooting 3 1 3 4 5...
Страница 224: ...Additional Checks for Troubleshooting ESIE05 04 3 62 Part 3 Troubleshooting 3 1 3 4 5...
Страница 226: ...ESIE05 04 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 252: ...ESIE05 04 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Страница 384: ...Disassembly and Maintenance ESIE05 04 5 134 Part 5 Disassembly and Maintenance 3 1 5 5...
Страница 390: ...ESIE05 04 vi Index 3 1 4 5 W Wiring diagrams Indoor units k 1 61...