Commissioning
Installer reference guide
217
EWSAH/X06D
Daikin Altherma 3 WS
4P675764-1 – 2022.04
1
Go to [A.4.3]:
Commissioning
>
UFH screed dryout
>
Status
2
You can read out the value here:
Stopped at
+ the step
where the underfloor screed dryout was stopped.
—
3
Modify and restart the execution of the program
(a)
.
—
(a)
If the UFH screed dryout program was stopped due to a power failure and the power
resumes, the program will automatically restart the last implemented step.