11
|
Configuration
Installer reference guide
198
EWSAH/X06D
Daikin Altherma 3 WS
4P675764-1 – 2022.04
Energy metering
Energy metering
If energy metering is performed by the use of external power meters, configure the
settings as described below. Select the pulse frequency output of each power
meter in accordance with the power meter specifications. It is possible to connect
up to 2 power meters with different pulse frequencies. If only 1 or no power meter
is used, select '
None
' to indicate the corresponding pulse input is NOT used.
#
Code
Description
[9.A.1]
[D‑08]
Electricity meter 1
:
▪
0
None
: NOT installed
▪
1
1/10kWh
: Installed
▪
2
1/kWh
: Installed
▪
3
10/kWh
: Installed
▪
4
100/kWh
: Installed
▪
5
1000/kWh
: Installed
[9.A.2]
[D‑09]
Electricity meter 2
:
▪
0
None
: NOT installed
▪
1
1/10kWh
: Installed
▪
2
1/kWh
: Installed
▪
3
10/kWh
: Installed
▪
4
100/kWh
: Installed
▪
5
1000/kWh
: Installed
Sensors
External sensor
#
Code
Description
[9.B.1]
[C–08]
External sensor
: When an optional external
ambient sensor is connected, the type of the
sensor must be set.
▪
0
None
: NOT installed. The thermistor in the
dedicated Human Comfort Interface and in the
outdoor unit are used for measurement.
▪
1
Outdoor
: Connected to PCB of the indoor
unit measuring the
outdoor temperature
.
Remark:
For
some
functionality,
the
temperature sensor in the outdoor unit is still
used.
▪
2
Room
: Connected to PCB of the indoor unit
measuring the
indoor temperature
. The
temperature sensor in the dedicated Human
Comfort Interface is NOT used anymore.
Remark:
This value has only meaning in room
thermostat control.
Содержание Altherma 3 WS
Страница 1: ...Installer reference guide Daikin Altherma 3 WS EWSAH06D 9W EWSAX06D 9W A B C Z 1 2 3 9 ...
Страница 258: ......
Страница 259: ......
Страница 260: ...4P675764 1 2022 04 Copyright 2022 Daikin Verantwortung für Energie und Umwelt ...