5. Installation
40
PNEG-499
Cycle Plus Pan Feeder
Cycle Plus Pan Feeder Control Installation (Continued)
Power Up Clear:
By depressing and holding the Modify and increase switches during a power up, the time
is automatically set to 8:00 AM and all program functions are set to 0. Program functions that involve time
are set to 12:00 AM.
Operation
After following the wiring procedures, always power up the unit for the first time with all toggle switches in
the center OFF position. Then, operate the feeders manually to test the feeders, before running the system
in the Automatic mode.
The system can be operated manually by placing the toggle switches into the MANUAL (up) position. The
feeders may be shut off by placing the toggle switches into the OFF (center) position.
For automatic computer control operation, place the toggle switches in the automatic (down) position. With
the switches in this position, the feed cycles are operated automatically based upon the program
information that has been entered. During a feeding cycle, the feeding LED is ON, indicating that a feeding
operation is in progress. During the feeding cycles, the number of the feeding being fed is displayed in the
left most digit of the display--just under the "Feeding Number". During those cycles the three digits to the
right show what looks like a rotating auger.
NOTE:
Feeders and fill system will not run if the weigh tank is empty (upper scale switch open).
Содержание PNEG-499
Страница 1: ...PNEG 499 Cycle Plus Pan Feeder Installation and Operation Manual PNEG 499 Date 01 01 15...
Страница 2: ...2 PNEG 499 Cycle Plus Pan Feeder...
Страница 48: ...48 PNEG 499 Cycle Plus Pan Feeder NOTES...
Страница 52: ...52 PNEG 499 Cycle Plus Pan Feeder NOTES...
Страница 53: ...7 Parts List PNEG 499 Cycle Plus Pan Feeder 53 Grilled Centerhouse Control Unit Components...