5. Installation
PNEG-499
Cycle Plus Pan Feeder
21
Service Section Kit Installation
The service section kit is to be placed before the feed hopper opposite the brood end of the house. It
should be on the other side of the feed hopper that a drive unit pulls feed from.
Figure 5O
Lay the two halves of the plexi-glass on top of each other so that they form a clear tube. Make sure the
ends are flush. Evenly space two (2) of the 2" hose clamps in the middle of the service section and tighten.
Slide another 2" hose clamp on each end of the service section, but
do not tighten
yet.
Figure 5P
Ref #
Description
Ref #
Description
A
Service section kit
C
Auger Travel
B
Drive Unit
Ref #
Description
Ref #
Description
D
2" (5.08 Cm) Hose Clamp
F
Bottom Half
E
Top Half
Содержание PNEG-499
Страница 1: ...PNEG 499 Cycle Plus Pan Feeder Installation and Operation Manual PNEG 499 Date 01 01 15...
Страница 2: ...2 PNEG 499 Cycle Plus Pan Feeder...
Страница 48: ...48 PNEG 499 Cycle Plus Pan Feeder NOTES...
Страница 52: ...52 PNEG 499 Cycle Plus Pan Feeder NOTES...
Страница 53: ...7 Parts List PNEG 499 Cycle Plus Pan Feeder 53 Grilled Centerhouse Control Unit Components...